Nanjing spray-painted light-transmitting film, Nanjing-grade light-transmitting film, Nanjing light-transmitting film installation manager Zhang’s mobile phone
:
Engineering consultation
Soft film ceiling and grade-grade film fireproof ceiling from In terms of raw materials and construction techniques, the two are very different, but also have many similarities. However, because the current grade membrane and soft membrane ceiling have not developed to the extent that everyone is familiar with them, even some decorators have difficulty understanding the construction differences between the two in terms of materials.
Soft film ceiling (translucent film) construction procedures: structure production-membrane material customization-keel installation-ceiling installation-cleaning:
1. During the structural frame production stage, parts that need attention, modeling ceiling soft film Ceiling frame part, air outlet, sprinkler, smoke detector, downlight, trumpet, etc. The specific production process is based on the site conditions and modeling conditions of each construction site, including the production of code keel chassis, flat code keel chassis, double-button code keel chassis, and wooden chassis (suitable for iron or impermeable steel).
2. The membrane material customization stage is the top priority of the entire project. The membrane material customization stage consists of multiple procedures such as size determination, drawing production, production management, order packaging, etc. It is also an area prone to errors, so be careful. Notice.
3. The fixing method of the keel needs to be strictly in accordance with the design drawings. Pay attention to fixing the wooden square on the surrounding cement wall, and then fix the code on the wooden square. The wood must be sprayed with fireproof material.
4. Ceiling installation: The entire process requires professional installation, which may damage the material. The specific steps are as follows (after all the aluminum alloy keels for installing the soft film ceiling are fixed, install the soft film. First open the soft film and use a special heating air gun to fully heat it evenly, and then use a special inserting knife for the soft film ceiling to remove the soft film. Tension and insert it onto the aluminum alloy keel, and finally trim the excess soft film around it completely.)
6. Installation steps of the special three-dimensional special-shaped soft film ceiling: According to the design requirements of the drawing, install the soft film ceiling at the level where it is required A circle of support keels (can be wooden squares or square steel pipes) is fixed around the height position. (See construction design drawings for details). Note: Some places with relatively large areas require installation in blocks to achieve good results. This requires adding a wooden strip in the middle. This is handled based on the actual situation. Finally, professional construction personnel use special cleaning tools to clean the soft film ceiling materials and site environment.
The construction process of grade-membrane fireproof ceiling (grade-grade fireproof film):
Compared with soft film ceiling, translucent film, lattice ceiling, etc., which are all complicated, it can only be completed when the construction team is strong enough. Difficult ceiling project. The general steps are as follows. First, the system can be adapted to the internal conditions of various buildings through spring traction, tensioning and installation. Secondly, it is connected to the frame through a special elastic hook, tightened and fixed. Third, point-link, tighten and fix with the wall or other structures through steel wire ropes. Fifth, secure it to the frame through the metal pressure piece and tighten it to secure it. The entire construction process is very complex, and designers only need to understand the above six steps to carry out relevant designs.
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Nanjing inkjet translucent film, Nanjing Class A translucent film, Nanjing translucent film installation】are provided by member【tak mei decoration materials engineering company limited
】,By Titker Trade Network members 【tak mei decoration materials engineering company limited
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!