Jianggan well point dewatering, deep well dewatering, Jianggan dewatering well, light well point dewatering, Jianggan road foundation pit dewatering
日期:2014-10-26
浏览:
51
Welcome to consult! 18667133778Engineering dewatering, deep well dewatering, tube well dewatering, foundation pit dewatering, strong technical force,DeviceAdvanced. It has four chief engineers, eight engineers and 50 technical workers who have been engaged for more than eight years. Mechanical Model: SPJ-500 water well drill with three units, SPJ-300 water well drill with four units There are six SPJ-200 water well drills, two stone drilling machines (600 meters deep), eight SPJ-150 water well drills, and nine SPJ-100 water well drills, which can meet the water consumption of enterprises and institutions of 4-400 tons/hour, 68 sets of light well point dewatering equipment, and 980 deep well dewatering pumps. This well can provide direct water supply to industrial production and has a wide range of uses for bathing and leisure centers. It can also be used for breeding, farmland irrigation, and as water for large shopping malls and hospitalsAir conditioning The configuration can also be used as emergency backup water source for fire protection in various enterprises and units. This well is a must-have for all enterprises and institutions. It is warm in winter and cool in summer. It is inexhaustible and inexhaustible. The water output of a good well can reach 4-400 tons or more per hour (depending on demand). The water source is definitely taken from the water layer tens or even hundreds of meters below the ground. The water quality is clear and pure. A deep well can not only solve the emergency of water shortage, but also save a lot of tap water and sewage fees, bring double economic benefits to the enterprise, and truly achieve the purpose of long-term benefit from a single investment. Deep well construction procedures A. Medium-sized deep wells are constructed by PPRPlastic pipeThe material diameter is 160mm, and the drilling is 300mm, the surrounding hole spacing is filled with yellow sand, and the depth and water volume are determined according to the geology and topography. B. Large deep wells have high-pressure and high-temperature cement pipes. The diameter of the well pipe is 360mm. Each pipe is 4 meters long. Steel hoops are connected at both ends. The two pipes are directly connected by electric welding. The drilling diameter is 600mm and the depth can reach 100-600 meters. Filling between surrounding holesQuartz strong>Sand, the amount of water is determined by your company's usage, ensure water is used. Dewatering construction procedures There are two construction plans for dewatering wells. A. There is deep well dewatering (large-diameter dewatering). The depth of the dewatering effect can reach 60 meters, and the circumference and diameter are 40 meters. Construction is carried out according to topography and geological reports to determine the plan. B. Light well point dewatering (vacuum dewatering by inserting steel pipes), the dewatering effect depth can reach 7 meters, the circumference and diameter are determined according to each group and set, and the final construction plan is determined according to the geological report and plan drawing. Drilling specifications Drilling specifications: diameter 100mm-1600mm, depth 10-600 meters, water output: 4-100 tons/hour. Dewatering well specifications: There are three types of dewatering well specifications: deep well dewatering (large diameter dewatering), light well point dewatering (vacuum dewatering by inserting steel pipes), and small well point dewatering. Service items include machine-drilled deep wells, mechanical cooling water, water source air-conditioning wells, drinking water wells, farmland wells, factory water wells, old well reconstruction, and repair of deep well pumps. The water consumption can be customized according to your company's needs. Project construction dewatering, large foundation pits, subways, tunnels, basements, sewage pipes and pipes tens of meters underground, etc. Business quotation of deepwater well specifications: 100mm to 1600mm, depth between 10 to 600 meters, total water volume 4 to 100 tons/hour. The business quotation is based on the water consumption of your organization, the diameter and depth of the well and the materials you choose (Pipe, water pump, etc.) to decide. Large-diameter dewatering wells are priced according to the depth of the well and the construction period. Light well point dewatering is priced according to each group and set of engineering dewatering, deep well dewatering, tube well dewatering, and foundation pit dewatering. We have strong technical force and advanced equipment. It has four chief engineers, eight engineers and 50 technical workers who have been engaged for more than eight years. Machinery model: three SPJ-500 water well drills, four SPJ-300 water well drills, six SPJ-200 water well drills, two rock drilling machines (600 meters deep available), eight SPJ-150 water well drills , nine sets of SPJ-100 water well drills, meeting the water consumption of 4-400 tons/hour for enterprises and institutions, 68 sets of light well point dewatering equipment, and 980 sets of deep well dewatering pumps. This well can provide direct water supply to industrial production and has a wide range of uses for bathing and leisure centers. It can also be used in the breeding industry, farmland irrigation, as a water air conditioner in large shopping malls and hospitals, and as an emergency backup water source for firefighting in various enterprises and units. This well is a must-have for all enterprises and institutions. It is warm in winter and cool in summer. It is inexhaustible and inexhaustible. The water output of a good well can reach 4-400 tons or more per hour (depending on demand). The water source is definitely taken from the water layer tens or even hundreds of meters below the ground. The water quality is clear and pure. A deep well can not only solve the emergency of water shortage, but also save a lot of tap water and sewage fees, bring double economic benefits to the enterprise, and truly achieve the purpose of long-term benefit from a single investment. Deep well construction procedures A. Medium-sized deep wells are made of PPR plastic pipes with a diameter of 160mm, drilled holes of 300mm, and filled with yellow sand around the hole spacing. The depth and water volume are determined according to the geology and topography. B. Large deep wells have high-pressure and high-temperature cement pipes. The diameter of the well pipe is 360mm. Each pipe is 4 meters long. Steel hoops are connected at both ends. The two pipes are directly connected by electric welding. The drilling diameter is 600mm and the depth can reach 100-600 meters. Fill the surrounding holes with quartz sand, and the amount of water will be determined according to your company's usage to ensure water use. Dewatering construction procedures There are two construction plans for dewatering wells. A. There is deep well dewatering (large-diameter dewatering). The depth of the dewatering effect can reach 60 meters, and the circumference and diameter are 40 meters. Construction is carried out according to topography and geological reports to determine the plan. B. Light well point dewatering (vacuum dewatering by inserting steel pipes), the dewatering effect depth can reach 7 meters, the circumference and diameter are determined according to each group and set, and the final construction plan is determined according to the geological report and plan drawing. Drilling specifications Drilling specifications: diameter 100mm-1600mm, depth 10-600 meters, water output: 4-100 tons/hour. Dewatering well specifications: There are three types of dewatering well specifications: deep well dewatering (large diameter dewatering), light well point dewatering (vacuum dewatering by inserting steel pipes), and small well point dewatering. Service items include machine-drilled deep wells, mechanical cooling water, water source air-conditioning wells, drinking water wells, farmland wells, factory water wells, old well reconstruction, and repair of deep well pumps. The water consumption can be customized according to your company's needs. Project construction dewatering, large foundation pits, subways, tunnels, basements, sewage pipes and pipes tens of meters underground, etc. Business quotation of deepwater well specifications: 100mm to 1600mm, depth between 10 to 600 meters, total water volume 4 to 100 tons/hour. The business quotation is determined based on the water consumption of your organization, the diameter and depth of the well, and the materials you choose (pipes, water pumps, etc.). Large-diameter dewatering wells are priced according to the depth of the well and the construction period. Light well point dewatering is priced according to each group and set. Welcome to consult! 18667133778
特别提示:本信息由相关企业自行提供,真实性未证实,仅供参考。请谨慎采用,风险自负。