Hello and welcome toTitker Trade Network!
主营超高分子量聚乙烯(UHMW-PE)板材、强化超高分子量聚乙烯工程塑料、稀土强化超高分子聚乙烯材料、超高分子聚乙烯(UHMW-PE

free member

Professional customization of power plant coal bunker linings

价格 20.00元/公斤
total supply
10000000000 公斤
MOQ
1 公斤
brand
宁津泰达
area
ShandongDezhou City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Professional customi

¥20.00/公斤

Hunan and Hubei regi

¥20.00/公斤

Ultra-high molecular

¥20.00/公斤

Ultra high molecular

¥20.00/公斤

Shandong TEDA Rubber

¥20.00/公斤

Qinhuangdao manufact

¥20.00/公斤

Shop information

area:Shandong Dezhou City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

宁津泰达橡塑有限公司

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
密度:
0.99
Ningjin Taida Rubber and Plastic Co., Ltd. specializes in the production of coal bunker linings, silo linings, and mixer linings. Ultra-high molecular weight polyethylene sheet is an engineering plastic with excellent properties, such as extremely high wear resistance and impact resistance. performance, very low friction coefficient, good self-lubricating properties, excellent low temperature resistance, chemical corrosion resistance, etc. Several issues that need to be paid attention to when installing the coal bunker lining:
If the coal bunker lining is connected to the steel plate, it is necessary to drill a diameter hole on the coal bunker lining and use a special arc gasket to weld directly to the steel plate. Bolts can also be welded on the steel plate, and then holes are drilled on the lining plate, and connected with arc washers, nuts or countersunk screws.
If the coal bunker lining is connected to cement material, the condition of the bunker should be inspected. Any protrusions or dents on the coal bunker lining should be smoothed as much as possible, and the bunker should be cleaned thoroughly to prevent the coal bunker lining from being damaged. The board is not installed tightly or the board falls off.
Before installing the coal bunker lining, the installation process should be formulated according to the actual situation of the bunker and followed during installation. Before installing the lining board, the upper and lower edges should be beveled when cutting and cutting, and the joints between the boards should be overlapped and installed in a way that the upper and lower sides of the silo are overlapped and installed. activities to avoid or reduce the lag area.
The installation requirements of coal bunker linings vary according to local weather, bunker shape, size and other factors.
Similar products on the site

Natural PEEK board and rod, bl

¥950.00/公斤

PPE+PS N1150

Negotiable

PET board imported fiberglass

¥9.90/公斤

Hebi anti-static endurance boa

Negotiable

Imported nylon plate manufactu

¥10.00/公斤

PP 2300NCA

Negotiable

PLA 6350D

Negotiable

Professional manufacturer dire

¥16.00/公斤

PA66 FR370 Japan Asahi Kasei C

¥1.00/公斤

EEATX8030

Negotiable

Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Professional customization of power plant coal bunker linings】are provided by member【宁津泰达橡塑有限公司 】,By Titker Trade Network members 【宁津泰达橡塑有限公司 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network