c cement pole digging machine manual
> Bazhou Yutong Line Machinery Manufacturing Co., Ltd. is engaged in the design and production of power and telecommunications construction machinery and equipment. professional manufacturer. Main products: Telephone pole digger, tractor winch grinder, motor winch grinder, cable pay-off truck, cable pay-off stand, aluminum alloy pole machine, fiberglass puncher, wire tightener, wire clamp, cable pulley, cable Electric construction tools such as scissors, cable net sleeves, hydraulic pipe jacking machines, trenchless directional drills, power steel poles, pile foundations, power steel pole piling projects, as well as various safety tools and line hardware products.
>Leading innovation and reliable quality are the company's consistent pursuits. One-year warranty and lifetime service are the company's consistent commitments. Yutong Company will continue to pursue perfection in product quality...
>The second-generation front-mounted cement pole digging machine produced by our company is simple and convenient to operate and has good performance. It is widely used in power, telecommunications, municipal administration and other related industries. Improve work efficiency.
>This product is suitable for geological layers: loess layer, clay layer, soil layer containing pebbles and sand, weathered rock and soil layer, and frozen soil layer.
>Geology not used by this product: rocks, construction backfill waste, full sand layer, and domestic waste layer.
>Main steps of operation:
>1.>
First fill the reducer oil under the hydraulic motor.
>2.>
Check the amount of hydraulic oil and the appearance of the oil circuit to see if there is oil leakage.
>3.>
Hook up the negative gearbox (i.e. the output shaft gearbox) before operation. Especially in cold areas, preheating should be done in advance to prevent oil stiffness.
>4. >
The operating steps of the digging machine:
>.>
First support the left and right legs to keep the tractor balanced according to the terrain.
>.>
Adjust the front and rear angles of the oil cylinder and try to make the drill bit vertical to reduce resistance.
>.>
When lifting the drill bit up after digging a hole, be careful to rotate it forward and lift it up by one centimeter. Only after doing the above can you lift it up still (Note: Keep balance)
>5. >
Simple diagram of two hydraulic distributors
>The left support foot is the front and the balance arm is the rear The big arm supports the forward and reverse rotation of the drill bit on the right support foot