- 工作室尺寸:
- D700*W800*H900 (mm)
- 温度范围:
- RT+10℃~300℃
- 温度均匀度:
- ≤±2%
● Working room dimensions**
Foreword
With the rapid development of modern industrial technology, the application fields of electrical and electronic products are becoming increasingly broad, and the environmental conditions they are subjected to are becoming more and more severe. Complex and diverse. Only by reasonably stipulating the environmental conditions of the product and correctly selecting the environmental protection measures for the product can we ensure that the product is protected from damage during storage and transportation and is safe and reliable during use. Therefore, artificial simulated environment testing of electrical and electronic products is an indispensable and important link to ensure their high quality. Artificial simulated environment tests are scientific summaries of actual environmental impacts and are typical, standardized, easy to use, and easy to compare. The diversification of environmental conditions and the importance of environmental testing also put forward more stringent requirements for environmental testing equipment.
Thermal aging test chamber is suitable for adaptability testing of electrical, electronic, instrumentation and other products, parts and materials when stored, transported and used in high temperature environments. It is suitable for all types of electronics, electricians, electrical appliances, plastics, etc. Reliability testing equipment for heat resistance testing and quality control engineering of raw materials and devices. This equipment is especially suitable for high temperature resistance testing of plastics, optical fibers, and other products.
Reference standards
Meet the requirements of test standards such as B/"Air Thermal Aging Test Chamber" and B/3-"Hot Air Accelerated Aging and Heat Resistance Test of Vulcanized Rubber or Thermoplastic Rubber".
Equipment performance parameters
● Temperature range R+℃~3℃
● Temperature uniformity
● Temperature fluctuation.℃
● Number of air changes ~ times/hour< br/> ● Turntable speed r/ is adjustable, disc-type sample turntable
● Time setting range ~ hours
● Ventilation time: ~ (,,,) adjustable
● Power supply voltage 3
● Ventilation method: Instrument controlled automatic ventilation
● Circulation method: Fan forced circulation method
Box structure
● Outer wall: Beautiful appearance, electrostatic spray on the surface Plastic treatment
● Inner wall: stainless steel plate
● The box body is insulated with ultra-fine glass fiber insulation cotton to avoid unnecessary energy loss
● A transparent window is set up at a reasonable position on the box door. To observe changes in indoor samples (with lighting), it has the advantages of transparency, heat insulation, explosion-proof, etc.
● Uses a multi-wing centrifugal fan to provide powerful air circulation to avoid any dead spots and evenly distribute the temperature in the test area. .
● The air circulation design is designed with upper air outlet and lower air return. The wind pressure and wind speed are in compliance with the test standards
● The test door and the machine body adopt double layers of high temperature aging resistant asbestos rope seals to ensure that the test area is airtight
br/> ● There is a turntable hanger inside the box, which is convenient for placing samples
● A high-quality fixed movable wheel is installed at the bottom of the instrument, which can easily move the instrument to a designated position. The movable wheel has The locking device can fix the instrument
● The top of the box is equipped with ventilation holes to facilitate ventilation in the box. At the same time, a ventilation solenoid valve is installed in the equipment control cabinet to facilitate automatic replacement according to the set time requirements. air to ensure timely and effective exchange of internal and external air. There is a test hole on the side of the box. The test hole can be used with an external test power cord or signal line
● The control part of the equipment is designed on the right side of the equipment, with temperature controllers, Time relay and control switch, easy to operate, simple and easy to maintain
Heating system
● Heating system: completely independent system, using enamel nickel-chromium alloy electric heating heater
● Heater control method :Contactless periodic pulse width modulation, R (solid state relay)
● The output power is calculated by microcomputer to achieve high precision and high efficiency of electricity consumption
Electrical control system
● Adopt Fuji digital display temperature control instrument imported from Japan, easy to operate, more accurate temperature control
● Accuracy: .℃ (display range)
● Resolution: .℃
● Temperature sensor: platinum resistance
br/> ● Control method: heat balance temperature and humidity control method
● Fault indicator light, automatic shutdown protection function
● Settable time from seconds to hours
● Temperature control adopts ..+R system Coordinated control
● It has the function of automatic calculation, which can immediately correct the temperature change conditions, making the temperature control more accurate and stable
● The main electrical components are from French Schneider, Japanese Fuji, Omron and other brands
Protection system
● Over-temperature protection
● Power supply phase loss/reverse phase protection
● Automatically shut down and display a fault light if there is a fault
Environmental usage conditions
● The ground is flat, Good ventilation
● There are no strong electromagnetic radiation sources nearby
● Appropriate maintenance space is left around the equipment
● Temperature: between ℃ ~ ℃
● Relative humidity
● Air pressure: ~
● 3 three-phase five-wire system
● The user is required to configure an air or power switch of corresponding capacity for the equipment at the installation site, and this switch must be independent and dedicated for the use of this equipment
Random information
● Operating instructions, circuit diagram
● Certificate, warranty card
● Precautions, basic shipping accessories, maintenance matters
Delivery instructions
● Supply The party is responsible for the freight and door-to-door delivery, and the goods are shipped within 3 days after the advance payment is received
● If the buyer pays the total amount in advance, the balance will be paid in full once the goods pass the acceptance inspection
● The supplier is responsible for the installation and commissioning operation introduction , until the buyer's employees operate independently
● The warranty period is one year, starting from the date of installation and acceptance. The supplier promises to provide spare parts for life. If the after-sales service must be solved on site, the supplier will arrive at the user site within hours.