Hello and welcome toTitker Trade Network!
体育场地面:设计、生产、销售、施工:PU塑胶跑道材料、单组份胶水、EPDM颗粒、硅PU球场、丙烯酸球场、人造草坪、木地板球场、PVC

free member

Recommended 400-meter track<Huade Sports>Standard size of 400-meter track

total supply
0
MOQ
0
area
GuangdongShenzhen
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Being rich means bei

Negotiable

Silicon PU Stadium C

¥1.00/

School plastic track

¥1.00/

Henan artificial gra

¥1.00/

Specializing in the

¥1.00/

The latest mobile ar

¥1.00/

Shop information

area:Guangdong Shenzhen

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Meter track standard size Huade Sports specializes in the production, sales and research and development of plastic track materials, and professionally undertakes the construction of various plastic track projects. We have the best prices, a professional construction team, and complete After-sales service is your trustworthy choice. Consulting service hotline: Plastic track, also known as all-weather track and field track, is composed of polyurethane prepolymer mixed with polyether waste tire rubber, rubber particles or granular pigment additives and fillers. The plastic track has the characteristics of good flatness, compressive strength, high hardness, elasticity, appropriate and stable physical properties, which is conducive to athletes' speed and technology, effectively improves sports performance and reduces the fall injury rate. Plastic track is composed of polyurethane rubber and other materials. It has certain elasticity and color, and has certain UV resistance and aging resistance. It is internationally recognized as the best all-weather outdoor sports ground material. The total length of a standard runway is meters and should be composed of two parallel straights and two curves of equal radius. Except for grass runways, the inside of the runway shall be demarcated by a raised edge made of suitable material. The rim is about 1 cm high and at least 1 cm wide.
The total length of a standard runway is meters and should be composed of two parallel straights and two curves with equal radii. Except for grass runways, the inside of the runway shall be demarcated by a raised edge made of suitable material. The rim is about 1 cm high and at least 1 cm wide.
If part of the edge needs to be temporarily moved due to a field event, the original edge position should be marked with a centimeter-wide white line and plastic cones or small flags should be placed with a height of at least 10 centimeters and intervals of up to 10 meters. . This provision also applies to that part of the track in the meter obstacle course where athletes turn from the main track to cross the pool. For grass runways without sharp edges, the inner edge of the runway should be marked with centimeter-wide lines, and small flags should be placed at meter intervals. To prevent athletes from stepping on the line, the flag should be placed on the line, tilted toward the court, and at an angle to the ground. The size of the small flag is about 10cm. The length of the flagpole is 1cm.
The length of the runway should be measured centimeters beyond the outer edge of the inner edge of the runway. If there is no protruding edge, the measurement should be carried out centimeters beyond the outer edge of the marking line.
Note: The IAAF Track and Field Facilities Manual contains all technical information on track structural design markings. These rules give the basic principles that should be followed.
In all track events of meters and below, each athlete should occupy a lane. The minimum lane width is meters and the maximum lane width is meters. The lane line width is centimeters. All lane widths should be the same. The length of the first lane shall be measured in accordance with the provisions of the above paragraph, and the length of other lanes shall be measured centimeters beyond the outer edge of the inner lane line.
Note: The lane width should include the right lane line

< r/ _ />
Similar products on the site

Affordable and easy to process

¥10.00/

MGE engineering plastic alloy

¥55.00/

Exclusive agent for PA66 Ameri

Negotiable

PP 2300K

Negotiable

Genuine agent sales POM Americ

Negotiable

PP FY7HB

Negotiable

PP 3210G4

Negotiable

Black PAI board "Imported PAI

¥10.00/

EEA 4700

Negotiable

PPPH350

Negotiable

Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Recommended 400-meter track<Huade Sports>Standard size of 400-meter track】are provided by member【深圳市华德体育教育设备有限公司 】,By Titker Trade Network members 【深圳市华德体育教育设备有限公司 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network