Product Details
Product Features
Suitable for foundation grouting of machine bases, anchor bolts and other equipment.
. Reinforcement, repair and reinforcement of building beams, slabs, columns, foundations, floors and roads.
3. Can be used for anchoring anchor bolts and steel bars and structural reinforcement.
. Embedding and fixing of construction joints using reverse driving method in subways, tunnels, underground and other projects.
. And secondary grouting for fixed connections between steel structures (rails, steel frames, steel columns, etc.) and foundations.
Edit this paragraph for reference usage
The reference usage calculation is based on tons/cubic meter to calculate the actual usage.
It is precisely because the strength of the grouting material is high, far exceeding the strength that cement can achieve, and it changes the shrinkage characteristics of cement during solidification, so it is called high-strength non-shrinkage grouting material! !
There are different types of grouting materials, such as grouting materials, high-strength non-shrinkage grouting materials, etc. These are determined according to the standards of different architectural research institutes and do not represent the quality of the product. The specific usage conditions require test.
Edit this paragraph's technical indicators
[]Item
Model compressive strength vertical expansion rate
() Fluidity slump
Steel bonding strength
3 round steel rebar
General type (type) - - - . -
Reinforced type (type) - - - . -
Ultra-fine type (type 3) -
Emergency repair type (type) - - .
Note: Compressive strength is according to: "Cement Mortar Strength Test Method"
Expansion rate is according to: "Technical Specifications for Application of Concrete Admixtures".
When the thickness of the grouting layer is 3, select or
When the thickness of the grouting layer is 3, select or
When the thickness of the grouting layer is 3, select or
For quick emergency repair of the road surface, select type.
Edit the construction steps of this section
Prepare mixing machines, grouting equipment, templates and maintenance items, clean the grouting space and wet the concrete surface in advance.
, Set up the formwork and seal the joints of the formwork with cement (sand) slurry and plastic tape to ensure no water or slurry leakage.
Add water and stir according to the weight of the grouting material (mechanical stirring for 10 minutes, manual stirring for more than 10 minutes)
Pour the evenly stirred grouting material into the grouting part from one direction. If necessary, bamboo strips or steel drills can be used to guide the flow, and the template can be properly vibrated or lightly tapped.
. After the construction is completed, it should be covered with plastic film immediately and covered with straw curtains or quilts for 3 days of moist curing.
, The operating temperature is -℃ to ℃. It is strictly prohibited to mix any additives or external additives into the grouting material.
Edit this paragraph Construction and maintenance
Normal temperature maintenance
Before grouting, the daily average temperature should not be lower than ℃. After grouting, the exposed parts should be sprayed with curing agent or covered with plastic film in time, and covered with wet The straw bag stays moist. When covered with plastic film, the exposed surface of the cement-based grouting material should be covered tightly to keep condensation water in the plastic film. If it is inconvenient to water the surface of the grouting material, a curing agent can be sprayed.
.The grouting material should be kept in a moist state, and the curing time should not be less than.
3. When using fast-setting and fast-hardening cement-based grouting materials, maintenance measures should be carried out according to the methods required by the product.
High temperature maintenance
. Take measures before grouting to prevent the grouting parts from being exposed to direct sunlight or other thermal radiation.
.Take appropriate cooling measures, and the temperature of the concrete foundation and equipment floor in contact with the cement-based grouting material shall not exceed 3℃.
3. The temperature of the slurry entering the mold should not be greater than 3°C.
. Moisturizing and maintenance measures should be taken promptly after grouting.
Winter maintenance
. During winter construction, if the project does not have special requirements for strength growth, the exposed parts should be covered with plastic film and insulation materials in time after grouting is completed. The initial curing temperature should not be lower than ℃. Do not water when curing under negative temperature conditions.
.After the formwork is removed, if the difference between the surface temperature of the cement-based grouting material and the ambient temperature is greater than ℃, it should be covered and protected with insulation materials.
3. If the ambient temperature is lower than the minimum construction temperature required for cement-based grouting materials or the strength growth needs to be accelerated, artificial heating maintenance can be used. The maintenance measures should comply with the relevant provisions of the current national standard "Construction Regulations for Winter Period of Construction Projects" . []
Edit this paragraph to discuss the relationship between membrane removal, curing time and environment
Daily minimum temperature (℃) membrane removal time and maintenance time
-~
~
~ < br/> Edit this paragraph Advantages of high-strength non-shrinkage grouting material
It has good fluidity, micro-expansion, early strength, high strength and oil permeability resistance
It has a wide range of applications and can meet the needs of various industries. The construction needs of similar grouting projects are mechanical equipment for comprehensive industries such as metallurgy, electric power, petrochemical, chemical industry, light industry, etc.
3. In terms of construction, it has reliable quality, reduces costs, shortens the construction period and is easy to use[3]
Edit this paragraph High-strength non-shrinkage grouting material
Product Description
Prestressed pipe grouting material has passed the international quality management system certification and is supervised by the Highway Science Research Institute of the Ministry of Transport. It is mainly composed of cement, special admixtures, It is supplemented by a variety of mineral modified components and high molecular polymer materials. It has the characteristics of low water-to-binder ratio, high fluidity, zero bleeding, micro-expansion, and good durability. During construction, it is directly added with water and stirred. The performance of the product has reached the international leading level after being identified by the Science and Technology Department of the Ministry of Transport.
Product Usage
It is widely used for grouting of various beam prestressed pipes and grouting of equipment foundations, anchors and other components. It can also be used for nuclear power plant shell grouting, loose concrete, cracks and holes and other defect repairs. .
Product Features
Low water-to-binder ratio
Water-to-binder ratio is only
High fluidity
The fluidity of the slurry after leaving the machine can reach up to Within
Appropriate setting time
Initial setting and final setting
High stability
The free bleeding rate of slurry 3 and the bleeding rate between steel wires are both
Micro expansion
3 produces ~ expansion, the expansion rate is controlled between ~
Early strength and high strength
Compressive strength 3, compressive strength
High durability
Frost resistance level The chloride ion diffusion coefficient is greater than Fluidity ~
3 fluidity ~ bleeding rate, 3 capillary bleeding rate
Free bleeding rate, pressure bleeding rate,.
.Compressive strength,
Flexural strength ,
The free expansion rate is 3~
~
No corrosion to the steel bars
Construction instructions
The pulping process must use the - type developed by Hubei Zhongqiao Technology Co., Ltd. For high-speed pulping machines, first add an appropriate amount of water to clean the equipment and at the same time wet the barrel wall. Then add water to the scale position of the pulping machine, turn on the mixing pump and circulation pump, and add 3 (packs) of grouting material at a constant speed. The pulping machine should be in working condition during the feeding process. After the feeding is completed, stir for 3~ and introduce the slurry into the storage bucket. Stir until slurry is complete.
Packaging and Storage
Net weight of each bag, packed in paper-plastic composite bags
Avoid damaging the packaging bags during transportation and storage, and strictly prevent moisture and direct sunlight
Shelf life is months.
1. Product Features
Early strength and high strength: high hourly strength, and the strength can reach more than 3 in a day. Production can be started the day after the equipment is installed.
Self-leveling: Just add water and stir on site, then pour it directly into the equipment foundation. It can fill all the gaps in the equipment foundation without vibrating. The fluidity can reach 3.
Emblem expansion: ensures close contact between the equipment and the foundation.
Oil penetration resistance: After being immersed in engine oil for 3 days, its strength is higher than before being immersed in oil.
Durability: Tens of thousands of fatigue tests, no significant change in strength in several freeze-thaw cycles.
2. Scope of application
Injection of anchor bolts of large equipment and precision equipment, secondary injection of machine base.
, secondary pouring for the fixed connection between steel structure and concrete.
Pouring of post-tensioned prestressed reinforced concrete tunnels at low negative temperatures.
, plant tendons.
Rapid repairs of equipment foundations, bolt holes, roads, floors, road sleepers, etc.
, other pouring construction under low negative temperature.
Packaging, storage and transportation
. Packaging specifications: / bag, stored in a ventilated and dry place and protected from direct sunlight.
.The shelf life is 3 months. If it exceeds the shelf life, it should be re-inspected before it can be used.
3. Product packaging is subject to actual delivery. This picture is for reference only. Beijing Borui Shuangjie New Technology Co., Ltd.
Address: Unit Room Yinhailantian, Zhenxing Avenue, Nanchang County
Telephone:
Mobile:
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Ganzhou CGM high-strength non-shrink grouting material manufacturer】are provided by member【Beijing BORI Shuangjie New Technology Co
】,By Titker Trade Network members 【Beijing BORI Shuangjie New Technology Co
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!