- 朱经理::
- 13939455505
- 朱经理::
- 13939455505
Type vertical coal-fired steam boiler installation and operating instructions
< 】
>Structure introduction
Type vertical horizontal water tube boiler adopts traditional combustion technology. Coal is thrown from the furnace door and burned on the grate. The flue gas passes through the horizontal water pipes in the furnace and washes away the fine carbon black and dust contained in the flue gas. It is cut by the multi-layer tube bundle and falls on the grate for re-burning, and is discharged through the chimney. atmosphere.
Characteristics of the second boiler
Characteristics of the boiler
Compact structure, easy installation and relocation, small footprint, and low investment in infrastructure.
The flue gas longitudinally washes the convection tube bundle to make full use of the heating surface to improve boiler efficiency.
Due to multiple return passes and multiple cycles of flue gas, the purpose of natural dust removal is achieved.
Installation Instructions
Three Pre-installation Preparations
After the boiler is transported to the site, for the sake of speed, the following work must be done before installation
Organization and staffing
Boiler installation must have a dedicated person responsible for it, including the participation of the boiler, as well as plumbers, fitters, hoists, cold workers, welders and auxiliary workers
Study the relevant information carefully
The relevant personnel carefully study the "Steam Boiler Safety Technical Supervision" Regulations" and boiler drawings, installation instructions and other technical documents to understand and master installation, lifting and operation and other matters.
Determine the installation location
It is best to choose the installation location close to the steam consumption location, in order to shorten the pipeline, reduce infrastructure costs, and reduce heat loss.
Convenient water supply and drainage.
The storage and transportation of fuel and ash are convenient.
Keep the boiler unobstructed during installation and transportation
The layout of the boiler room should comply with the regulations of the boiler room in Chapter 8 of the "Steam Boiler Safety Technical Supervision Regulations" of the Ministry of Labor. There should be sufficient light and good ventilation, and there should be no water accumulation on the ground. In order to ensure the convenience of operation, operation and maintenance, there should be 1 meter of space in front of the furnace, 3 meters of space behind the furnace, and no less than 3 meters of space on both sides.
It is strictly prohibited to store toxic and flammable items in the boiler room.
The door to the outside of the boiler room should open outwards, and the windows in the lounge should also open outwards.
Foundation preparation
Carry out foundation construction according to the foundation diagram. The thickness of the concrete can be determined according to the geological conditions. The proportion of sand, gravel and concrete should be appropriate when mixing.
Installation of large parts of four boilers
Equipment acceptance
After the boiler is shipped, the parts and components are counted according to the manufacturer's factory delivery list, and the equipment is inspected according to the boiler drawings and technical documents. Integrity. Check whether the large parts of the boiler are damaged or deformed during transportation.
When unloading large parts of the boiler, one end of the base can be tied with steel wire ropes on both sides, and one end of the boiler shell head is inserted into another steel wire rope with a lifting lug. Find the lifting center and let the boiler slowly rise. The capacity of the lifting equipment Not less than a ton. After the boiler is removed from the vehicle, it should be placed on a wide horizontal surface. The bottom of the boiler should be supported by brackets to avoid damage to the tube holder, etc.
When the boiler is in place, it must be in an upright state. When upright, use lifting equipment to grab the lifting lugs on the top of the boiler. Do not tie any other parts.
After the boiler is in place, the front, rear, left, and right sides should be kept level, and the inclination is allowed to be no less than 1. Otherwise, the lower parts should be raised with pads.
There should be no large gaps where the boiler contacts the foundation. It must be tight and air-tight. Where there are gaps, cement should be used to caulk the joints.
> Henan Yinchen Boiler Group (Industrial and Commercial Registration Number Henan Industrial and Commercial Administration Bureau query) was established at the beginning of the year, referred to as Yinchen Boiler (registered trademark). The company is headquartered in the Industrial Cluster Zone of Taikang County, Henan Province. The production operation area is located in Henan Province To the west of Fucaolou Town, Taikang County, the factory is adjacent to Xubo Expressway and Shangzhou-Zhou Expressway, and the national highway runs through the production area. It has a unique geographical location and convenient transportation conditions. Yinchen Boiler Co., Ltd. is among the first batch of companies to obtain a national boiler manufacturing license. One of the backbone enterprises. It has the manufacturing license qualification of Class B boiler and Class I and II pressure vessels. It is a member unit of the China Welding Association, a director of the China Industrial Boiler Association, and was awarded the title of Enterprise of Observing Contract and Valuing Credit by the Henan Provincial Administration for Industry and Commerce. The entire product management system has passed the international Quality system certification.
> The company headquarters covers an area of more than 10,000 square meters, with a construction area of nearly 10,000 square meters, a registered capital of 10,000 yuan, an average annual production capacity of steamed tons, and an output value of hundreds of millions of yuan. The company has employees and technical elites People, including senior engineers and professional technicians. It is a comprehensive high-tech private enterprise integrating scientific research, design, development, manufacturing, processing, sales and installation. Yinchen Boiler Group invested 100 million yuan in the Taikang Industrial Cluster to build the Henan Province The largest and most complete glass-lined equipment manufacturing base "Henan Yinuo Pharmaceutical and Chemical Containers Co., Ltd." at the end of the year invested 10,000 US dollars with the Republic of Seychelles to build Taikang's only Sino-foreign joint venture boiler enterprise "Henan Dingsheng Boiler Co., Ltd."
>
>The company mainly produces
> Coal-fired steam boilers, steam boilers, hot water boilers, thermal oil furnaces, coal-fired boilers, cross-flow steam boilers, coal-fired hot water boilers, oil-fired steam boilers , biomass boiler, gas steam boiler, coal-fired thermal oil boiler, oil-fired hot water boiler, gas hot water boiler, oil-fired boiler, gas boiler, biomass steam boiler, hot blast furnace and other eighteen series, one hundred and forty specifications Conventional products. The main heat energy products that can be used for production and processing, centralized heating and decentralized heating are exported to all parts of the country and surrounding countries and regions. Series circulating vulcanized bed boilers (series fuel (series gas boilers (/series vertical cross-flow steam) Boiler (//Series biomass boiler series double drum water tube boiler (/New water and fire tube boiler (/B series coal gasification environmental protection boiler) (/Series organic heat carrier boiler (10,000 kcal waste heat boiler, various autoclaves, superheated Eight series and multiple varieties of reactors, heat exchangers, reactors, fully automatic constant pressure variable frequency tower-less water supply systems, etc. are available for production and processing, which are the main heat energy required for centralized heating and decentralized heating. The company uses advanced manufacturing technology and strict quality control Testing, good technical guidance, comprehensive quality assurance system, and perfect after-sales service have enabled the products to be sold at home and abroad, and are exported to Africa, North America, Russia, Mongolia, South Korea, Vietnam, Myanmar, Japan, the Philippines and Southeast Asian countries and regions.
> Henan Yinchen Boiler Group We always adhere to the policy of quality first in scientific and technological innovation, attach great importance to the introduction of new technologies and the development of new products, formulate a number of preferential policies, create a relaxed talent environment, and recruit elites from all parties, creating a good situation where talents and enterprises grow together. . It has established long-term cooperative relationships with institutions of higher learning and scientific research units such as Xi'an Jiaotong University, South China University of Technology, Zhengzhou University, and Beijing Zhiguang Boiler Research Institute. It has an independent workstation to provide strong guarantee for the research and development and manufacturing of the company's new products.
>Contact Information
>Henan Yinchen Boiler Co., Ltd.
>Contact Manager Zhu
>Telephone
>Mobile phone
>
>Email @
>Website
>
>Contact address No. Fucaolou West Industrial Zone, Taikang County, Henan Province, Zhoukou, Henan Province
>