Construction of decorative components ● Installation operating procedures
>1. On-site inspection
d. The ambient temperature of the construction site and the surface temperature of the base wall shall not be lower than Celsius within hours after construction. The wind force shall not be greater than the base level. Cover dry moisture rate %.
d. When installing larger components, supports are required for temporary fixing.
d Check that there are no floating dust stains, release agents, hollows, protrusions and weathered objects on the base wall that may affect the bonding strength.
d. Requirements for flatness and verticality: The maximum deviation should be less than 1 meter when checked with a horizontal line.
2. Install European-style lines
According to the construction drawings, pop up the positioning line (center line or side line) at the location where the line is to be installed.
d. Apply about a width of glue on both sides of the line (the viscosity of the glue must be strictly proportioned). After applying the glue, immediately paste the lines on the wall. Use your hands to squeeze the lines evenly and compact them. The distance between the lines on the wall should be about the thickness of the glue. Immediately after gluing, check the flatness and clean up the glue squeezed out around the lines.
d. After splicing, use a gray knife to smooth the gray seams so that the stitching becomes one. After drying, if there is excess bonding mortar left in the stitching, it can be polished with sandpaper.
d. During the curing period of the finished product after construction, attention should be paid to the protection of the finished product and it is strictly prohibited to step on it or hit it with heavy objects. If there is any damage, the entire pin should be removed and reinstalled.