Hello and welcome toTitker Trade Network!
Mining machinery, construction machinery and equipment, power tool

free member

5.5kw explosion-proof water drilling rig

价格 160.00元/台
total supply
200 台
MOQ
1 台
brand
九众
area
ShandongJining City
Delivery period:
Shipped within 2 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

BLD3-17-5.5KW cycloi

¥130.00/台

TCJ180 cooling tower

¥340.00/台

Long life 3NBB15-12/

¥260.00/台

Long life NB15/1.2-1

¥260.00/台

BLY7-17-22 cycloidal

¥130.00/台

ZDY450 bevel gear re

¥340.00/台

Shop information

area:Shandong Jining City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Jining Jiuzhong Machinery Enterprise Equipment Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
功率:
3-5.5kw
转速:
1420-2820r/min
电压:
380/660v
.Explosion-proof water exploration drilling rig
The series of mining rock electric drills (hereinafter referred to as rock electric drills) have the characteristics of reasonable structure, convenient movement, easy operation, safety and reliability. It is suitable for drilling and water exploration in mines with coal dust hazards. It can also be used for drilling in other mines or geotechnical engineering. It can also be used to explore water in coal seams. Its English name is r.
.The strong overload capacity of the rock electric drill can reduce the stuck part of the drill or drill through the gangue to form a high hole rate. The drilling rig needs a drill frame to drill in any direction, such as horizontally forward or tilted upward.
. Water drilling rigs are strictly prohibited from dry drilling (except when using spiral blade drill pipes) and strictly implement the method of first supplying water, then starting drilling, first stopping drilling and then stopping water. During drilling, attention should be paid to the water supply situation. If water suddenly stops, drilling must be stopped immediately to allow the drill bit to leave the bottom of the hole in time to prevent drill bit clogging and drill sticking.
.Rock drilling machine series parameters
Rated voltage

/

Drilling rig weight



Rated power



Drilling speed

/

Working frequency



Working mode

Continuous

Rated current




Motor Number of phases

Three-phase AC

Motor speed

/

Retraction speed

/

Drilling depth



Overall dimensions

&#;

. When drilling a hole, slowly rotate the hand wheel in the direction of the arrow and gently connect the clutch. When the drill bit body is completely drilled into the rock, tighten the clutch one week later, but not too hard. . When drilling to the required depth, quickly turn the handwheel in the reverse direction to stop advancing. Then press the arrow in the opposite direction to tighten the clutch and the main unit quickly retreats. Wait until the drill bit completely exits the hole before stopping drilling. Otherwise, the drill bit and parts will be easily damaged. At this time, turn the handwheel to the neutral position.
If the drill pipe is bent or stuck during the drilling process, the drill should be withdrawn immediately to check whether the drill bit is blunt or chipped, whether it has encountered a hard break, or whether the voltage at the motor incoming line meets the rated voltage. If it is low, The voltage must be adjusted to the rated value.
When drilling a rock hole, the flow rate of water is &;/the pressure is.&;. In order to extend the service life of the drill bit and improve the working conditions of the operator, water-powder-discharging wet drilling is adopted. During the drilling operation, only the handwheel electric drill can be operated to advance and withdraw quickly.
A power tool with a rotary cutting mechanism and an automatic feeding mechanism for medium-hard and rock drilling blastholes.
Operation method: Determine the erection position of the drill frame (homemade) according to the use occasion and the location of the drilling. Install the chain on the main machine and then install the main machine on the runway. Connect both ends of the chain to the runway and adjust the chain pull rod. The chain acquires a certain amount of tension to secure the runway to the drill frame.
Factory address: Liying Industrial Park, Rencheng District, Jining City, Shandong Province
Consultation phone number
:
Online:
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【5.5kw explosion-proof water drilling rig】are provided by member【Jining Jiuzhong Machinery Enterprise Equipment Co., Ltd. 】,By Titker Trade Network members 【Jining Jiuzhong Machinery Enterprise Equipment Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network