- 规格:
- 325
- 壁厚:
- 8
- 长度:
- 12
According to the requirements of the group’s anti-corrosion steel pipe manufacturers to comprehensively and thoroughly eliminate safety hazards in oil and gas pipelines, Liaoyang Petrochemical anti-corrosion steel pipe manufacturers established a leading group for the management of hidden dangers in long-distance pipelines, with a professional production planning and safety group under them to formulate detailed work plans and conduct Crude oil and product oil pipelines with a total length of 10 kilometers have been inspected for hidden dangers. Since most of the oil pipelines are located in rural areas and the roads are rugged, some areas require inspectors to walk along the pipelines for inspection and use pipeline locators for precise positioning. During the day, the staff traveled long distances, and at night they sorted out the identified hidden dangers, established a standardized hidden danger registration form, classified the hidden danger categories and levels, and formed a detailed hidden danger management ledger. Various major hidden dangers such as tree encroachment and insufficient safety distances in factories and houses, greenhouses, major hidden dangers, general hidden dangers, totaling were identified.
In view of the fact that long-distance pipelines are widely distributed and have complex hidden dangers, the hidden danger management team has clarified the division of tasks according to the requirements for pipeline hidden danger management, reversed the time nodes, divided the identified hidden dangers into districts and counties, and strengthened cooperation with local governments. Communication and coordination with relevant government departments. During the process of hidden danger management of long-distance pipelines, the staff of the hidden danger management team participated in several coordination meetings on pipeline hidden danger management organized by local governments at or above the county level, submitted the remaining copies of the hidden danger management assistance letter to the government, and reported the remaining copies of the hidden danger management summary to all For identified hidden dangers, emergency prevention and control measures will be implemented simultaneously before the rectification is completed. The procedures for rectification, acceptance, and cancellation will be implemented in accordance with the investigation, assessment, and classification procedures. Closed-loop management will be implemented, and the rectification effect will be evaluated item by item, accepted, and canceled.
At the same time, the Liaoyang Petrochemical Anti-corrosion Steel Pipe Manufacturer has deeply publicized the "Pipeline Protection Law" and basic knowledge of pipeline protection, so that people along the line realize the importance of oil pipeline protection and actively participate in oil pipeline protection work. An information network composed of anti-corrosion steel pipe manufacturers, workshop managers, line inspectors, farmers, and local governments along the line has been established to solidly promote pipeline protection work at different levels, jointly build a pipeline protection system, and improve the pipeline protection of the people along the pipeline. Awareness has created a good atmosphere for villagers along the line to jointly participate in pipeline protection.