- 产地:
- 山东
- 型号:
- 齐全
- 规格:
- 标准
/Type terrazzo machine
Type terrazzo machine Type terrazzo machine Terrazzo machine Models are complete and various. Welcome to order
Our factory is a professional manufacturer of terrazzo machines in Shandong Province and has been producing terrazzo machines for many years. Historically, we have developed more than 20 types of road construction and maintenance machinery such as pavement terrazzo machines, which are widely sold throughout the country and used in high-grade highway construction, and are well received by users.
The price is subject to the telephone quotation
1. Application of terrazzo machine
The terrazzo machine is mainly suitable for polishing terrazzo floors and marble floor tiles.
2. Characteristics of terrazzo machine
It is used to polish terrazzo and marble floor tiles, and the size of the tiles is controlled within a certain range.
Equipped with workstations, multiple groups of grinding heads, automatic conversion of workstations, automatic grinding, feeding, grouping and step-by-step grinding, it can complete all coarse, medium, fine and polishing work at one time.
It is simple and convenient to operate and requires only one person to operate normally, ensuring the loading and unloading of floor tiles, stable performance, safety and reliability.
The surface is smooth and comparable to marble.
With a high degree of automation, the savings on labor, electricity, labor intensity, space, and costs are obvious.
It meets quality requirements first time and has high production efficiency, which can help the grindstone brick industry achieve two key leaps in production capacity and economic benefits.
3. Main parameters of terrazzo machine
> Machine model
Grinding disc diameter
Grinding disc speed
Coarse grinding efficiency
㎡/
㎡/
Grinding disc life
㎡/disc
㎡/disc
/>
Motor power
4. Precautions for installation and operation of terrazzo machine
Operators must wear rubber boots , wear insulating gloves.
The terrazzo machine should perform grinding operations when the concrete reaches the design strength.
Before operation, check and confirm that all connecting parts are tight. Use a mallet to lightly tap the grindstone to make a crisp sound without cracks.
For electrical circuits, weather-resistant insulated four-core soft wires must be used. The switch should be a push-button switch and installed on the handle of the stone grinder. Cables should be installed off the ground and should not be dragged on the ground. The cables should be undamaged and well protected and grounded.
The handle of the terrazzo machine must be covered with an insulating tube, and the circuit must be protected by zero connection. There must be no less than two contacts, and a leakage protector must be installed (the leakage operating current should not be greater than the operating time, and the operating time should be less than.
After turning on the power and water source, press the handle to lift the grinding disc off the ground, and then start the motor. And check to confirm that the rotation direction of the grinding disc is consistent with the direction shown by the arrow. After the operation is normal, slowly lower the grinding disc and start the operation. .
During operation, the cooling water used must not be interrupted, and the water consumption should be adjusted so that the working surface does not dry out.
During operation, if the grinding plate is found to be beating or making abnormal noise, the machine should be shut down immediately for maintenance. When shutting down , the grinding disc should be lifted first and then shut down.
After replacing the new grinding stone, grind it on the waste water grinding stone floor or the surface of the waste cement product first, and then put it into work on the working surface after the diamond cutting edge is ground out.< br/>. The grinding block must be clamped, and the fixture should be checked frequently to prevent the grinding stone from flying out and injuring people.
After operation, the power supply should be cut off, the mud in each part should be cleaned, placed in a dry place, and covered with a rainproof cloth Cover.
, electrical circuits, switches, etc. must be installed and repaired by electricians, and other personnel are not allowed to disassemble and connect them at will.
Jining Shunyuan Mechanical Equipment Co., Ltd.
Contact Wang Meng
Telephone
Cell phone