Hello and welcome toTitker Trade Network!
主营超高分子量聚乙烯(UHMW-PE)板材、强化超高分子量聚乙烯工程塑料、稀土强化超高分子聚乙烯材料、超高分子聚乙烯(UHMW-PE

free member

Installation of TEDA rubber and plastic wear-resistant coal bunker lining

价格 20.00元/公斤
total supply
2000000 公斤
MOQ
1 公斤
brand
宁津泰达
area
ShandongDezhou City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

TEDA is the first ch

¥18.00/公斤

Polyethylene water a

¥21.00/公斤

High-rise calendered

¥20.00/公斤

Types of mc nylon ro

¥20.00/公斤

Inner Mongolia Hebei

¥20.00/公斤

Hunan and Hubei regi

¥20.00/公斤

Shop information

area:Shandong Dezhou City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

宁津泰达橡塑有限公司

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
密度:
0.93
Coal bunker lining installation method 1. Taking into account the angle of loose materials and the friction coefficient between the material and the lining, it is recommended that the angle between the material surface of the bunker and the horizontal direction is so that after the lining is installed, the material can achieve overall flow in the entire bunker to avoid or reduce Smaller retention zones eliminate the need for oscillators and air cannons.
Before installing the second lining board, the condition of the silo should be checked. Any bulges or dents should be smoothed as much as possible. The used cement silo body should be thoroughly cleaned in advance to prevent the lining board from being installed loosely. Or a board failure may occur.
Before installing the three linings, the installation process should be formulated according to the actual situation of the silo and followed during installation.
When installing the four lining boards, the joints perpendicular to the material flow direction should be minimized to reduce the flow resistance of the material and achieve the best logistics effect.
5. Before installation, the lining board should be cut and cut. The upper and lower sides should be beveled. The joints between the boards should be overlapped and installed in an upper and lower manner, and different reservations should be made according to the local climate and the shape and size of the silo. size expansion joints.
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Installation of TEDA rubber and plastic wear-resistant coal bunker lining】are provided by member【宁津泰达橡塑有限公司 】,By Titker Trade Network members 【宁津泰达橡塑有限公司 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network