Hello and welcome toTitker Trade Network!
Reinforcement materials Waterproofing materials

free member

Jiujiang non-shrinkage grouting material manufacturer-CGM high-strength grouting material

total supply
0
MOQ
0
area
JiangxiNanchang City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Jiangxi Nanchang City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Beijing BORI Shuangjie New Technology Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details

High-strength non-shrinkage grouting material
>High-strength non-shrinkage grouting material is a cement-based self-flowing micro-expanding dry mortar with early strength, high-strength self-flowing and micro-expansion properties, and is suitable for secondary grouting concrete of equipment foundations. Structural reinforcement and reconstruction, anchoring of steel bars and anchor bolts, etc.
Product Features
Early strength and high strength. The compressive strength can reach above 1 hour after grouting. The bolts can be tightened and the machine can be started for testing. The highest day intensity can reach above.
It has high self-flowing properties and can be used by adding water and stirring on site. It can fill all gaps without vibrating.
No shrinkage after micro-expansive grouting to ensure close contact between equipment bolts and foundation.
In winter, outdoor construction is allowed to be carried out at a minimum temperature of ℃.
Durability: This product is an inorganic cementing material and has a service life greater than that of the base concrete. After tens of thousands of fatigue tests, there is no significant change in the strength of freeze-thaw cycles.
Oil permeation resistance and high temperature impact resistance. After being immersed in engine oil, the strength is higher than before being immersed in oil. Flame cutting and welding operations of the steel bars are allowed after the reinforcement is planted.
Scope of application

General reinforcement type
Grouting thickness << Equipment foundation Secondary grouting, anchor bolts, embedded steel bars, reinforcement and reinforcement of building beams, slabs, columns, foundations and floors.

Pisolite reinforced type
Containing large aggregates is suitable for grouting layer thickness and grouting length < secondary grouting of equipment foundation. Reinforcement and reinforcement (repair thickness) of the building's beam-slab-column foundation and floor.

Ultra-fine reinforced type
Ultra-fine aggregate is suitable for secondary grouting of equipment foundations and steel structure column footings with grouting layer thickness <<. The gaps between the concrete beams and columns reinforced angle steel and the concrete are grouted.

Super early-strength reinforcement type
The hourly strength reaches 100, which is suitable for rapid repair of cement concrete pavements such as railway sleepers, airport runways, etc., rapid repair of water sealing and leakage, and rapid repair of leaks.

>Technical indicators
Comply with/standard indicators ℃ standard curing test block size
Project
Model
Vertical
Expansion rate
Compressive strength
Fluidity
Slump
Minimum construction temperature (℃)
Reference
Water consumption
Bulk weight
Days
Day
Day
Universal reinforced type

Pisolite reinforced type

Ultra-fine reinforced type

Project
Model
Vertical
Expansion rate
Compressive strength
Fluidity
Slump
Reference water consumption
Bulk weight
Hours
Days
Days
Super early strengthening type

>Strength conversion relationship between various trial mold sizes
Trial mold dimensions
Strength ratio
Age
Day
Day
Day

>Grouting construction instructions
>One foundation treatment
>Foundation surface It should be chiseled. Clean the surface of the foundation. There should be no gravel, floating slurry, ash, oil, dirt, release agent and other debris. The surface of the foundation should be fully moistened 1 hour before grouting and any accumulated water should be removed 1 hour before grouting.
Two formwork
Set up the formwork according to the grouting construction drawing. The joints between the formwork and the basic formwork should be sealed with cement slurry tape to ensure that the entire formwork does not leak.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the formwork should be higher than the upper surface of the equipment base.
If grout running occurs during grouting, it should be dealt with in time.
Three grouting material preparations
Generally, add water and stir according to the standards for the general reinforced type. Add water and stir according to the standards for the pisolite reinforced type.
The mixing of high-strength non-shrinkage grouting materials can be done mechanically or manually. It is recommended to use a forced mixer for mechanical mixing to ensure sufficient and even mixing for 2 minutes. Manual mixing time is completed within minutes. The fluidity of the mixed grouting material decreases as the parking time increases and should be used up within minutes. It is strictly prohibited to mix any additives into high-strength non-shrinkage grouting materials.
Four grouting construction methods
Longer equipment or track foundations should be constructed in sections.
After the grouting starts, it must be carried out continuously without interruption and the grouting time should be shortened as much as possible.
Five Maintenance
After grouting is completed, the grouting material should be immediately covered with a straw bag or rock wool quilt and kept moist after the initial setting.
The grouting material mixing water and maintenance measures during winter construction should comply with the relevant provisions of the current "Construction Quality Acceptance Code for Concrete Structure Engineering".
Do not subject to vibration for hours after grouting to avoid damaging the unhardened grouting layer.
The relationship between mold removal, curing time and ambient temperature
Daily minimum temperature (℃)
Film removal time
Curing time

>Packaging, storage and transportation< br/>Packaging specifications/bags are stored in a ventilated and dry place and protected from direct sunlight.
The shelf life is one month. If it exceeds the shelf life, it should be re-inspected before it can be used.
>Product packaging is subject to actual delivery. This picture is for reference only.
"Jiujiang non-shrinkage grouting material manufacturer-CGM high-strength grouting material"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Inorganic active thermal insulation mort Anhui Fuyang tactile pavement tiles/Zhon Xi'an manufacturers supply 108 construct Welcome to Zhongguan acid-resistant bric Heze high-strength non-shrink grouting m Tianjin high strength non-shrinkage grou Qamdo concrete inorganic wear-resistant What to do if the wall becomes sandy and How to repair honeycomb leaking reinforc Hubei Yichang tactile pavement bricks/hi Hunan Chenzhou tactile pavement bricks/t Special automatic pressure grouter for c What grouting material is used to reinfo Tianjin factory direct sales JT-30 polym Loudi; Qinlu color embossed floor constr
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Jiujiang non-shrinkage grouting material manufacturer-CGM high-strength grouting material】are provided by member【Beijing BORI Shuangjie New Technology Co 】,By Titker Trade Network members 【Beijing BORI Shuangjie New Technology Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network