Hello and welcome toTitker Trade Network!
Reinforcement materials Waterproofing materials

free member

Foshan grouting material factory direct sales

total supply
0
MOQ
0
brand
博瑞双杰
area
JiangxiNanchang City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Jiangxi Nanchang City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Beijing BORI Shuangjie New Technology Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details

High-strength non-shrinkage grouting material
>High-strength non-shrinkage grouting material is a cement-based self-flowing micro-expansion dry mortar. It has the characteristics of early strength, high strength, self-flow and micro-expansion, and is suitable for equipment foundations. Secondary grouting, reinforcement and transformation of concrete structures, anchoring of steel bars and anchor bolts, etc.
Product Features
The compressive strength of early and high strength can reach above. The bolts can be tightened and tested within hours after grouting. The highest day intensity can reach above.
It has high self-flowing properties and can be used by adding water and stirring on site. It can fill all gaps without vibrating.
There is no shrinkage after micro-expansion grouting, ensuring close contact between equipment, bolts and foundation.
In winter, outdoor construction is allowed to be carried out at a minimum temperature of ℃.
Durability: This product is an inorganic cementing material, and its service life is longer than the service life of the base concrete. After tens of thousands of fatigue tests and freeze-thaw cycles, there is no obvious change in strength.
. Resistance to oil penetration and high temperature impact. After being immersed in engine oil, the strength is higher than before being immersed in oil. Flame cutting and welding of the steel bars are allowed after planting.
Scope of application

Universal reinforcement type

Grouting thickness << secondary grouting of equipment foundation, anchor bolt anchoring, buried steel bars, building beams, plates, Reinforcement of columns, foundations and floors.


Pisolite reinforced type

Contains ~ large aggregate, suitable for grouting layer thickness, and grouting length < secondary grouting of equipment foundation. Reinforcement (repair thickness) of beams, slabs, columns, foundations and floors of buildings.


Ultra-fine reinforced type

Ultra-fine aggregate is suitable for secondary grouting of equipment foundations and steel structure column footings with grouting layer thickness <<. The gaps between the concrete beams and columns reinforced angle steel and the concrete are grouted.


Super early reinforcement type

Hourly strength is reached, suitable for rapid repairs such as railway sleepers, rapid repair of cement concrete pavements, airport runways, etc., and water stopping Quick leak repair.


>Technical indicators
Comply with/standard indicators ℃ standard maintenance, test block size,
Project

Model
< br/> Vertical

Expansion rate

Compressive strength

Fluidity

Slump

Minimum construction temperature (℃)

Reference

Water consumption

Bulk weight


Day

Day

Day

Universal reinforced type















~



Pisolite reinforced type








/>






~



Ultra-fine reinforcement Type











< br/>


~



Item

Model

Vertical

Expansion rate

Compressive strength

Fluidity

Slump

Reference water consumption

Test weight


Hours

Days

Days
< br/> Super early reinforcement type










/>


~




>Strength conversion relationship between various trial mold sizes
Try Mold size
Strength ratio









Age

days









days









day

< br/>







>Grouting construction instructions
>1. Foundation treatment
/>>The base surface should be roughened. Clean the foundation surface. There should be no gravel, floating slurry, floating ash, oil stains, release agents and other debris. The foundation surface should be fully moistened one hour before grouting. Remove any accumulated water one hour before grouting.
2. Formwork support
Set up the formwork according to the grouting construction drawing. The joints between the formwork and the foundation, and between the formwork and the formwork are sealed with cement slurry, tape, etc. to ensure that the entire formwork is watertight.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the formwork should be higher than the upper surface of the equipment base.
If grout running occurs during grouting, it should be dealt with in time.
3. Preparation of grouting material
Generally, add water and stir according to the standard for general reinforced type, and add water and stir according to the standard for pisolite reinforced type.
Mechanical or manual mixing can be used to mix high-strength non-shrinkage grouting materials. It is recommended to use a forced mixer for mechanical mixing, which can ensure sufficient and even mixing and the mixing time is minutes. Manual mixing time is completed within minutes. The fluidity of the mixed grouting material will decrease as the parking time increases, and it should be used up within minutes. It is strictly prohibited to mix any additives into high-strength non-shrinkage grouting materials.
4. Grouting construction method
For long equipment or track foundation, segmented construction should be used.
After the grouting starts, it must be carried out continuously without interruption, and the grouting time should be shortened as much as possible.
5. Maintenance
After grouting is completed, the grouting material should be covered with a straw bag or rock wool quilt immediately after initial setting and kept moist.
During winter construction, grouting materials, mixing water and maintenance measures should comply with the relevant provisions of the current "Construction Quality Acceptance Code for Concrete Structure Engineering".
Do not subject to vibration for hours after grouting to avoid damaging the unhardened grouting layer.
The relationship between mold removal, curing time and ambient temperature
Daily minimum temperature (℃)

Membrane removal time

Curing time
< br/> ~





~




< br/> ~












>Packaging, Storage and Transportation
Packaging specifications/bag, stored in a ventilated and dry place and protected from direct sunlight.
The shelf life is one month. If it exceeds the shelf life, it should be re-inspected before it can be used.
>The product packaging is subject to actual delivery. This picture is for reference only.
"Foshan grouting material factory direct sales"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Inorganic active thermal insulation mort Anhui Fuyang tactile pavement tiles/Zhon Xi'an manufacturers supply 108 construct Welcome to Zhongguan acid-resistant bric Heze high-strength non-shrink grouting m Tianjin high strength non-shrinkage grou Qamdo concrete inorganic wear-resistant What to do if the wall becomes sandy and How to repair honeycomb leaking reinforc Hubei Yichang tactile pavement bricks/hi Hunan Chenzhou tactile pavement bricks/t Special automatic pressure grouter for c What grouting material is used to reinfo Tianjin factory direct sales JT-30 polym Loudi; Qinlu color embossed floor constr
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Foshan grouting material factory direct sales】are provided by member【Beijing BORI Shuangjie New Technology Co 】,By Titker Trade Network members 【Beijing BORI Shuangjie New Technology Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network