Hello and welcome toTitker Trade Network!
Welded H-beam steel, Shandong steel structure, Shandong steel stru

free member

How to control the installation quality of steel structures

total supply
0
MOQ
0
area
ShandongZaozhuang City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shandong Zaozhuang City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Zibo Huake Steel Structure Construction Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
The use of steel structures in Shandong is already very common. When we install steel structures, how should we control the quality?
Before installation, the construction unit should check the product certificates, design documents and pre-assembly records of the components, and re-inspect and record the dimensions of the components. When the deformation and defects of the steel structure exceed the allowable deviation, they should be dealt with.
Before installation, detailed measurement and correction processes should be compiled. For welding of thick steel plates, process tests simulating the product structure should be conducted before welding and installation, and corresponding construction processes should be compiled. A certain camber should be preset for the assembled roof trusses.
After the steel structure is hoisted in place, the design requirement control points such as component positioning axis and elevation should be measured and marked, and the quality of the hoisted butt joints should be inspected before welding. Install temporary supports and steel corrugated cables to make the steel roof trusses safe and stable during construction.
When installing steel structures, the construction unit should submit the elevation dimensions, welding, painting, etc. of each component after hoisting to the supervisor for acceptance.
Only when the installation quality of the steel structure is guaranteed can the entire project be guaranteed. Everyone must pay attention to safety during the construction process. Never be reckless, safety first!
"How to control the installation quality of steel structures"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Guangzhou floor decking, 970 floor decki Membrane structure | parking shed membra Membrane structure | Stadium membrane st Square membrane structure | sewage treat Fixed Bearing Guangrun Rubber-Profession Sliding spherical bearings, when buying Steel stirrups Shock-absorbing spherical steel bearing High-quality anti-seismic spherical stee Seismic spherical steel bearings, comple Supply Tianjian manufacturer with strong Steel structure support mobile quick-rel Supply of wall support formwork equipmen Square steel shear wall formwork reinfor High-quality anti-seismic spherical stee
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【How to control the installation quality of steel structures】are provided by member【Zibo Huake Steel Structure Construction Co 】,By Titker Trade Network members 【Zibo Huake Steel Structure Construction Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network