- 售后:
- 现场指导
- 厂家:
- 昌黎天建
- 服务类型:
- 现场指导
= During construction, it is often necessary to fix the steel pipes one by one with wires before locking them
= Construction is inconvenient, time-consuming and labor-intensive. Secondly
= Because the length of the steel pipe does not match the required length
= The phenomenon of random cutting and overlapping is serious
= It causes a waste of resources and management difficulties, and often causes construction quality problems due to improper overlapping. Finally, because the iron pipe is round and the wooden square joint point has a small stress area, the strength and deformation of the two materials are very different
= Therefore, the wooden square sound is often compressed and deformed at the contact point, resulting in poor construction quality. Hard issues. The new mold products fundamentally change the traditional formwork construction process. The main backing is welded by two square tubes with the same cross-section size. During construction, after the wall bolts are installed
= Only one person needs to pick up the main backing horizontally, thread it on the bolts and lock it
br/> = It saves time and effort, and because the secondary backing used in conjunction with it is a steel square structure, the joint surface is evenly stressed and the construction effect is good. Most of today's residences are framed and short-limbed shear wall structures
= The main back corrugation of the wall formwork can meet various construction needs
= Shear walls and hidden columns of any size can provide stability and stability. Beautiful support
= The effect of firm support and first-class quality after formwork removal improves the quality of the project.