Hello and welcome toTitker Trade Network!
Examples of toys processed for sale: swing fish, spinning airplane

free member

New small train manufacturer, new robot pedal car manufacturer, children's bungee jumping manufacturer

价格 5800.00元/套
total supply
1000 套
MOQ
1 套
brand
国龙
area
HebeiShijiazhuang City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Water roller factory

¥3000.00/套

New pony inflatable

¥2000.00/套

New stuffed animal c

¥1300.00/套

New electric robot p

¥2400.00/套

Robot cart manufactu

¥1800.00/套

Large inflatable cas

¥155.00/套

Shop information

area:Hebei Shijiazhuang City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Hebei Shijiazhuang Tongye Guolong Toy Processing Factory

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
长宽高:
4.5
: >Small train installation instructions
< r > : >
: .>Please read the instructions carefully before using the button switch functions on the electrical console, and then operate according to the following methods , turn on the power, the power indicator light is on, press the fast button or slow button to prompt the small train to start, the stop button works, the speaker emits music, press the stop button (red), the small train stops running.
: ><:><:>
< r > : >.
: .>When connecting lines, please refer to the wiring diagram in the manual and use
: >
: .>The above
: >b
: .> copper core wire connects the red (
: >+
: .>) and black on the back wall of the console. (
: >
: .>) The two terminals are respectively connected to the sleeper (
: >
: .>) and the electrode (
: > +
: .>), in order to eliminate the unstable vehicle speed caused by poor contact at the track connection, additional wiring should be provided on the sliding contact electrode and the sleeper. The control box should be installed in a dry and ventilated room and well connected.
: ><:><:>
< r > : >.
: .>Track installation method
: ><:><:>
< r >: .>The site where the track is installed should be flat and dry, the slope of the track should be less than five thousandths, and the height difference of the track should be controlled
: >
: .>The sliding contact electrode should be flat and connected to the bakelite board The bolts at should be tightened.
: ><:><:>
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【New small train manufacturer, new robot pedal car manufacturer, children's bungee jumping manufacturer】are provided by member【Hebei Shijiazhuang Tongye Guolong Toy Processing Factory 】,By Titker Trade Network members 【Hebei Shijiazhuang Tongye Guolong Toy Processing Factory 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network