During the construction of embedded parts, welding begins after the steel bars and steel plates are processed. However, the following three preparations need to be made before welding:
: It is necessary to check whether the types of steel bars and steel plates meet the design requirements and mandatory standards. It stipulates that for those who do not meet the requirements, the reasons must be identified and properly resolved, and blind selection cannot be made.
: The selection of welding rod and flux models needs to be based on their usage requirements and different properties. When pressure submerged arc welding is used, welding rods that are suitable for the strength of the main metal should be used. When manual welding is used, the welding rod should be used according to the Low strength body metal welding rod models.
: The weld type of embedded parts should be determined by the size of the anchor bar. For anchor bars with larger diameters, pressure submerged arc welding is preferred. When construction conditions are limited, arc welding can also be used to select appropriate welds. The form can ensure the welding quality of embedded parts.
br>After completing the above work, we started welding the embedded parts. First of all, we need to use submerged arc pressure welding. When welding embedded parts, we must pay close attention to the coordination of arc starting, arc maintenance, and top pressure. We must always pay attention to removing rust and debris from the clamps of the electric board. At the same time, we must promptly repair the electrodes. The shape of the notch. If there are quality problems such as steel undercuts, pores, slag inclusions, steel plate welding penetration, steel plate dents, etc., the causes must be identified and the welding defects must be removed in a timely manner. When manual welding is used, the height of the fillet weld must comply with the standard. When perforated plug welding is used, the hole in the steel plate should be made into a bell mouth. The diameter of the inner opening should be larger than the diameter of the steel bar. The inclination angle should be 1, and the end of the steel bar should extend into the left and right sides of the steel plate. Special attention should be paid to strictly controlling the amount of current during welding. Prevent steel bars from being burned.
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years, specializing in the processing and production of various steel structures and steel components. Your satisfaction is our pride.
Headquarters address: Room 1, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person: Mr. Jin
Mobile:
Telephone:
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Preparation and methods before welding embedded parts】are provided by member【Shanghai Ruiling Construction Steel Structure Co
】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!