Hello and welcome toTitker Trade Network!
c-beam H-beam processing steel structure steel structure processin

free member

Regulations for the assembly of steel structural components in construction projects

total supply
0
MOQ
0
brand
睿玲
area
Shanghai
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shanghai

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shanghai Ruiling Construction Steel Structure Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
The assembly platform, formwork, etc. should be flat and firm to ensure the assembly accuracy of the components. Corresponding assembly measures must be proposed based on the drawing process and quality standards and combined with the characteristics of the components.
The possibility of welding should be considered. The welding deformation should be minimal and easy to correct, so as to determine whether to adopt one-time assembly or multiple assembly, that is, first assemble and weld into several parts, correct the welding deformation separately, and then assemble into components.
Welding shrinkage allowance and post-weld machining allowance should be considered.
All processed parts should be checked to see if their specifications, dimensions and quantity meet the requirements. All parts should be corrected, and any rust, burrs, oil, ice, and snow on the connecting contact surface and along the edge of the weld should be cleaned.
After the concealed parts are assembled, they must be confirmed by the quality inspection department before they can be welded or externally concealed. After the first batch of components is assembled, they should be fully inspected and confirmed to be qualified by the quality inspection department before assembly can continue.
When splicing is required, in order to reduce the internal stress of welding and facilitate correction after deformation, the splicing and welding should be inspected and corrected first before assembly.
A reasonable assembly sequence should be determined based on the structural form, welding method, welding sequence and other factors. Generally, the main parts should be first, then the secondary parts, the middle first and then the two ends, first transversely then longitudinally, first internally then externally, in order to reduce Deformation.
When using clamps for assembly, when dismantling the clamps, do not use a hammer to knock them down, but use gas cutting to remove them so as not to damage the base metal. The remaining weld scars and slag should be ground clean.
The width of the steel plate splicing should not be less than that, and the length should not be less than the section steel splicing length. All spliced welds are full penetration butt welds with qualified thickness by ultrasonic flaw detection and can be inspected by other methods such as ray or drilling.
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years, specializing in the processing and production of various types of steel structures and embedded steel components. Your satisfaction is our pride.
Headquarters address Room No. 1, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person Mr. Jin
Mobile phone
Telephone number
"Regulations for the assembly of steel structural components in construction projects"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Regulations for the assembly of steel structural components in construction projects】are provided by member【Shanghai Ruiling Construction Steel Structure Co 】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network