Product Details
The installation personnel must be in good health. Installers who suffer from high blood pressure, dizziness, heart disease, epilepsy, etc. and are not suitable for working at high altitudes are prohibited from working at high altitudes. . All installation personnel have the right to refuse all illegal instructions, rough construction and other operations that do not comply with safety regulations and requirements.
Transferring tools or small components at high altitude should be carried out step by step. It is strictly prohibited to throw construction waste and various items downwards.
During the installation process, components and items must not be stacked together on the shelf and must be safely spread out.
. All personnel at the construction site must wear safety helmets. It is strictly prohibited to wear slippers and high heels to enter the site. When working at heights, safety belts and non-slip shoes must be worn. It is strictly prohibited to work after drinking.
Installation personnel must receive three-level safety education and carefully study operating procedures and safety rules and regulations. If there are any illegal operations during construction, they should stop each other to eliminate potential accidents.
. Safety maintenance and warning signs should be set up at the construction site to prohibit irrelevant personnel from entering the construction area.
Insist on holding a safety meeting for all project site staff on Monday, so as to sound the alarm and take preventive measures, which should be done well, carefully and practically.
The construction team should hold a 10-minute safety meeting before work every day to explain the safety precautions for the day's construction, and remind the on-the-job personnel to take safety precautions according to the specific construction conditions to be prepared.
After the crane beam components are lifted into place, they should be assembled immediately and should not be stored at high altitude for a long time.
Before leaving get off work, all crane beams that are not fixed on the corbels should be installed and then leave the job. Necessary fixing measures should be taken for the crane beams that cannot be fixed temporarily. For example, if the ropes cannot be fixed, the crane beams should be hung from the corbels of the columns and stored to prevent the crane beams from being blown down from high altitude by strong winds and causing disaster.
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years, specializing in the processing and production of various types of steel, profile steel, steel structures, steel components, and embedded parts. Your satisfaction is our pride.
Headquarters address: Room 3, Building, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person: Mr. Jin
Mobile:
Telephone:
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Safety measures for steel structure engineering construction 1】are provided by member【Shanghai Ruiling Construction Steel Structure Co
】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!