The difference between pre-embedded parts and post-embedded parts

total supply
0
MOQ
0
brand
睿玲
area
Shanghai
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shanghai

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shanghai Ruiling Construction Steel Structure Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
The difference between pre-embedded parts and post-embedded parts depends on the order in which the embedded parts are placed during concrete structure construction. < r>Usually, standard floor embedded parts are installed according to the architect's drawings before the curtain wall is subcontracted. If the bid is submitted early enough (before the concrete body is out of line), the curtain wall company can provide a drawing of the embedded parts and cooperate with the general contractor for construction.
The embedded parts are made by the original architect and owner before the structure is completed. The schematic design is carried out by civil engineering, because the schematic is drawn out in a hurry, and with subsequent modifications, the utilization rate of embedded parts is generally not high. The embedded parts are then determined by the owner and architect after the divisions are determined. The curtain wall designer then orders the rear-embedded steel plates, which are installed by the curtain wall construction team. The embedded parts are connected to the structure using anchor bars: the embedded parts are usually fixed with expansion bolts, and now chemical anchors are also used.
Normal The cost of embedded parts is very low, the processing cycle is short, the versatility is high, and it can be kept in stock
Embedded parts can be placed in advance in places with large stress, and embedded parts can be used in places with small stress. When subjected to horizontal shear force and Post-embedded parts can be used for parts that require on-site positioning during construction (such as large glass), and pre-embedded parts should be used as much as possible in other places.
The rear embedded parts cannot be connected to the main steel bars and have poor lightning protection, while the pre-embedded parts can be connected to the main body. Since the pre-embedded parts are buried before the in-situ concrete is cast, and are connected to the main steel bars by wire binding and electric welding, there is no doubt that they are strong and are very good in terms of lightning protection and grounding. And the cost is relatively low, about - yuan.
The most important problem with rear embedded parts is the issue of materials and construction management:
Now our general design is * stainless steel expansion + * chemical anchor bolts. Taking stainless steel expansion as an example, the quality is very different. big.
During the construction process, there will be problems such as chemical anchor bolts. If the dust is not completely cleaned, their bonding effect will be affected, and steel bars will be hit during drilling with electric hammers.
The cost is relatively high, about - yuan.
However, the embedded parts placed first will have a slight deviation due to the expansion of concrete and other factors, while the position of the embedded panels placed later can be better controlled.
The cost of pre-embedding is low, and it can be welded on the board without affecting the strength. The cost of embedding parts later is high, and if no measures are taken for welding on the board, the strength of the chemical anchor will be affected, because the chemical agent will The heat intensity is only one-tenth of the original, which is very dangerous.
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years, specializing in the processing and production of various steel structures and steel components. Your satisfaction is our pride.
Headquarters address: Room 1, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person: Mr. Jin
Mobile:
Telephone:
"The difference between pre-embedded parts and post-embedded parts"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【The difference between pre-embedded parts and post-embedded parts】are provided by member【Shanghai Ruiling Construction Steel Structure Co 】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network