Construction requirements for rear embedded parts

total supply
0
MOQ
0
brand
睿玲
area
Shanghai
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shanghai

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shanghai Ruiling Construction Steel Structure Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Construction requirements for post-embedded parts (anchor bolts) ① Anchor bolts shall not be arranged in the concrete protective layer, and the anchoring depth shall not include the facing layer or plaster layer of the concrete.
② Anchors should not be set in areas with dense steel bars. They should avoid the main stress-bearing steel bars and drill holes must not damage the steel bars.
③ There should be no defects in the concrete around the anchor hole, and the depth of the anchor hole should be basically dry
④ Each connecting node should not have less than 1 anchor bolt.
⑤The diameter of the anchor bolt should be determined through calculation of bearing capacity and should not be smaller than.
⑥ After the chemical anchor is implanted in the anchor hole, it should be cured according to the curing conditions provided by the manufacturer. Disturbance is prohibited during the curing period
Chemical anchors cannot be welded and heated over a large area (local electric welding is acceptable).
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years. It specializes in undertaking the processing and production of various types of steel structures, steel sections, and embedded parts, and contracting various projects of steel structures and steel components. Your satisfaction is our pride.
Headquarters address: Room 3, Building, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person: Mr. Jin
Mobile:
Telephone:
"Construction requirements for rear embedded parts"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Yingde floor anti-corrosion supply Jiangmen anti-corrosion and wear-resista Construction of steel structure lighting Yin frame glass curtain wall production Creative design of combined curtain wall Stone curtain wall production and instal Shandong Rural Entrepreneurship New Buil A way to save money in producing plastic Universal simulation color marble relief Swinger Weinan manufacturer high-strengt DG grouting material manufacturer direct Xi'an Swinger Building Materials Company Swinger grouting material Shaanxi grouti DG grouting material manufacturer direct Baoji high-strength non-shrinkage grouti
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Construction requirements for rear embedded parts】are provided by member【Shanghai Ruiling Construction Steel Structure Co 】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network