- 桶:
- 1元
- Composition: A two-component special medium primer formulated with a mixture of epoxy resin, anti-rust pigments, additives and alcohols.
- Features:
3. b., '
- Greenhouse curing, fast drying, energy saving.
3. b., '
- It has low toxicity. Compared with general epoxy anti-rust primers, it can overcome benzene poisoning and organic amine poisoning. It does not contain heavy metal lead.
3. b. '
- It has excellent adhesion and protective properties to iron castings, steel castings and steel structural parts. It can be welded and has excellent cutability.
3. b., '
- The paint film has high mechanical strength, good impact resistance, flexibility, and excellent anti-rust properties.
3. b., '
- Two-component mixing, the use period is up to
- hours.
- Usage:
3. b., '
- Widely used in heavy machinery, general machinery, machine tools, transportation vehicles used in various operations, especially suitable for engineering machinery.
3. b., '
- As a shop primer, it is widely used in the coating construction of steel pretreatment.
- Technical Guidance
- Storage Stability: One year, after the storage period, it can still be used after passing the inspection. (The viscosity is allowed to increase, as long as the diluent used in this coating is used to achieve the required viscosity).
- Coating methods: spraying, rolling and brushing, etc.
- Instructions for use:
3. b., '
- Surface pretreatment: In order to achieve ideal coating quality, the coating surface must be pretreated mechanically or chemically to make the surface clean. The degree reaches
- level, that is, the surface of the oxide scale, rust, oil, dust and other dirt is removed to reveal the metallic luster.
3. b., '
- Paint mixing: This paint is packaged in two components. The two components should be stirred evenly before use, and then the ratio of component A to component B is
/>- Ratio
- (weight ratio) Mix the mixture evenly, then let it stand for
- minutes before use. After construction is completed, the spray gun and construction equipment should be cleaned with thinner in time.
3. b. '
- The construction environment should be relatively dry and the temperature should not be too low. It is better to be above - ℃.
3. b., '
- The construction site should maintain good ventilation and pay attention to fire prevention.
3. b., '
- Packing specifications: Main paint
- Bucket
- Curing agent
- Bucket