Hello and welcome toTitker Trade Network!
Straight high hair, high voltage generator, medium frequency dc hi

free member

High current generator | Three-phase high current generator | Long time high current generator

total supply
0
MOQ
0
brand
菲柯特
area
JiangsuYangzhou
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Trace moisture meter

Negotiable

DC high voltage gene

Negotiable

Open flash point tes

Negotiable

Microcomputer relay

Negotiable

Oil-type test transf

Negotiable

High current generat

Negotiable

Shop information

area:Jiangsu Yangzhou

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Yangzhou Fekete Electric Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Yangzhou Feikete Electric Co., Ltd. independently developed and produced the > High current The generator is a special equipment specially designed and manufactured for electric power departments and industrial and mining enterprises to conduct current load tests and temperature rise tests on electrical equipment such as various switches, current transformers and other electrical equipment.
This series of products adopts a split/integrated structure depending on the volume and weight of the product. It has the characteristics of stepless adjustment of the output current, a large range of current rise and balanced load changes, reliable operation, simple and safe operation, etc. It is an ideal equipment for industrial and mining enterprises to conduct upflow or temperature rise tests.

Note the rated output of the current generator: middle, the left is series and the right is parallel output parameters
< > < Model

> Rated capacity

> Rated input of converter

> Rated input of converter

Impedance
Voltage

No-load current

Structure
Form


< > Voltage regulator

> Booster

> Current

> Voltage

> Current

> Voltage
< br/>
< > /

>

>

>

>

>

>

> ? %

>? %

> Split


< > /

>

>
< br/> >

>

> /

> /

> ? %

>? %

> Split


< > /

>

>
< br/> >

>

> /

> /

> ? %

>? %

> Split


< > /

>

>
< br/> >

>

> /

> /

> ? %

>? %

> Split


< > /

>

>
< br/> >

>

> /

> /

> ? %

>? %

> Split



>
Ambient temperature ℃℃
There should be no place around the product that would seriously affect the insulation of the transformer, such as gas vapor, chemical deposits of dust, dirt and other explosive media.
Four working principles:
After this series of products is plugged into the working power supply, the output voltage of the voltage regulator is adjusted to obtain the large current required for the test.

Connect the working circuit according to the electrical schematic diagram. The transformer shell, operating table, etc. must be well grounded.
Turn on the power and the green indicator light on the console will light up. Press the start button, the red indicator light will light up, and the upflow device is waiting for upflow.
Rotate the voltage regulator evenly clockwise and pay attention to the output current indication on the operating table until the required high current is reached. In order to ensure test accuracy, a standard ammeter can be connected in series to the instrument terminal.
During the test, if any abnormality is discovered, the power supply should be cut off immediately and the cause should be identified before conducting the test.
After the test is completed, the voltage regulator must be returned to zero, press the stop button to cut off the power supply, and then cut off the working power supply before removing the test wiring to ensure safety.


>
< > < > Load conditions (% of rated)

> Maximum continuous operation time ( seconds)


< >

>


< >

>


< >

>




Newly installed and long-term unused transformers, Before operation, use a megohmmeter to measure the insulation resistance between the coils and the coil to the ground. It can be used only when the resistance value is not lower than megohms.
The upstream transformer and operating platform must be reliably grounded during use to ensure safety.
The flow should rise slowly and evenly during use, and excessive vibration should be avoided during transportation.
The contact surface between the voltage regulator and the brush should be kept clean. If necessary, wipe it clean with cotton gauze dipped in % alcohol.
This equipment should be kept in a clean, ventilated, dry and indoor location.


One operating station
One up-current transformer
One product certificate
A product instruction manual

"High current generator | Three-phase high current generator | Long time high current generator"Related Products
Related categories
室内环保检测仪器 Meteorological instruments gas analyzer Chromatograph Rubber and plastic special instruments Test chamber and climate environment equipment Thermometers Pressure instrument biological instrument flow meter Mechanical measuring instruments Experimental equipment Measuring standard instruments valve sensor Measuring tools measuring instrument Weighing instrument Level instrument Display instrument Transmitter Environmental testing instruments Logger counter Industrial timer Control (regulating) instruments Actuator base instrument Testing Machine Analytical Instruments Optical Instruments Electrical instrumentation car instrument Non-destructive testing instruments Electronic measuring instruments Special instrumentation Instruments and accessories Pneumatic unit combination instrument Electric unit instrument cluster Instrument power supply Automated complete control system Centralized control device Inventory instrumentation Packaging testing equipment Second hand instruments Other uncategorized Disinfection machine VOC detection equipment Ray detection equipment Formaldehyde detection equipment Benzene detection equipment Ammonia gas detector Other indoor environmental testing instruments
Related Information
Beijing functional testing tooling Handheld intelligent signal generation c ESKH switching leakage current sensor ES008 clamp-type AC current sensor ES020 portable CT clamp-shaped structure ES050 high harmonic current sensor ES050HV high voltage line current sensor ES3035E digital insulation resistance me ES5000 Clamp Current Recorder ES5001 clamp-on SD card current recorder ES3025 digital insulation meter ES3025E electric rocking watch ES3000 digital ground grid ground resist ES3001 digital ground soil resistivity t ES3002 Intelligent Ground Resistance Det
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【High current generator | Three-phase high current generator | Long time high current generator】are provided by member【Yangzhou Fekete Electric Co 】,By Titker Trade Network members 【Yangzhou Fekete Electric Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network