- 售后:
- 现场指导
- 价格:
- 优惠
- 性价比:
- 高
,
-During construction, it is often necessary to fix steel pipes one by one with wires before locking them
,
-Construction is inconvenient, time-consuming and labor-intensive. Secondly
,
-Because the length of the steel pipe does not match the required length
,
-The phenomenon of random cutting and overlapping is serious
,
-Resulting in a waste of resources and management difficulties, and construction quality problems are often caused by improper overlapping. Finally, because the iron pipe is round, the stress-bearing area of the connection point with the wooden pipe is small, and the strength and deformation of the two materials are very different
,
- so the wooden pipe is often pressed at the contact point Deformation, resulting in problems such as poor construction quality. The new mold products fundamentally change the traditional formwork construction process. The main backing is welded by two square tubes with the same cross-sectional size. During construction, after the wall bolts are installed
,
- Only one person needs to pick up the main backing horizontally and thread it through the bolts. Just lock it up
- It saves time and effort, and because the secondary backing used in conjunction with it is a steel square structure, the joint surface is evenly stressed and the construction effect is good. Most of today's residences are frame-short-limb shear wall structures
,
-The main back corrugation of the wall formwork can meet various construction needs
-Shear walls and concealed columns of any size can be used Provide stable and beautiful support for it
,
- Achieve firm support and first-class quality after formwork removal, improving the quality of the project
Changli Tianjian New Formwork Support
- The new assembled building formwork support system product is a new type of building material. It is one of the most technologically advanced building formwork technologies in my country's new building supports. It is the first generation of new building products in China's new assembled building formwork.
-The new assembled building formwork structure is mainly composed of panels, support structures and connectors.
-New assembled building formwork support system products include
- major categories, totaling
- products. They are: wall formwork adjustable main back fluting, wall formwork adjustable secondary back fluting, wall formwork opening lock, wall formwork male corner lock, wall formwork adjustable tie bars, wall formwork recirculating wall sleeves The pipe and roof formwork have adjustable main keels, roof formwork auxiliary keels and adjustable support ejector rods, etc.
-The new building construction component formwork support system includes three parts: vertical wall support system, roof support system and frame column support, which can meet different needs of construction.
-The vertical wall support system consists of the wall formwork with adjustable main back fluting, the wall formwork with adjustable secondary back fluting, hole locks, main back fluting corner locks (including hook bolts), wall bushings, and It consists of adjusting tie bars and inner corner locking hooks.
-The roof support system consists of an adjustable main keel, an auxiliary keel, and an adjustable support ejector rod.
-The frame column support system consists of main backing, wall formwork adjustable secondary backing and fixing bolts.
-The three sets of systems have flexible combinations and strict structures, and can be designed and configured according to the different requirements of customers' projects.