Hello and welcome toTitker Trade Network!
Screw hoist, winch hoist, cast iron gate, steel gate cleaning mach

free member

Hand screw hoist

价格 100.00元/台
total supply
100 台
MOQ
1 台
area
HebeiXingtai city
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

0.5X0.5 hoist gate,

¥100.00/台

PGZ type cast iron g

¥100.00/台

2X5T flashlight dual

¥100.00/台

QPQ2X5 fixed winch h

¥100.00/台

5T 8T hoist-screw ty

¥100.00/台

3t hoist 10t screw h

¥100.00/台

Shop information

area:Hebei Xingtai city

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Hebei Xinhe County Xiangtian Water Conservancy Machinery Factory

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Installation, use and maintenance of flashlight screw hoist:
Screw hoist:
Be sure to keep the foundation layout plane level
The contact area between the hoist base and the foundation layout plane must reach
%
The above screw axis should be perpendicular to the horizontal plane measured on the gate platform, and the horizontal plane measured on the gate platform should be perpendicular to the gate lifting eye hole to prevent the tilt of the screw from causing local stress and damage to the machine parts.
, Place the hoist in the installation position. Put a limit plate on the screw, screw the screw into the hoist from the lower part of the beam, and then put the limit plate on the screw after it emerges from the top of the hoist. The bottom of the screw rod is connected with the gate.
The basic building installation of the hoist must be stable and safe. The concrete for the machine base and basic components shall be poured according to the provisions of the drawings. When the strength of the concrete does not reach the design strength, the temporary support of the hoist is not allowed to be removed and changed, and the trial adjustment and trial operation are not allowed.
. Install the hoist and find the center according to the gate lifting centerline so that the centerline deviation does not exceed plus or minus
The elevation deviation does not exceed plus or minus
. Then the second stage concrete is poured or connected with the embedded steel plate.
The installation of the electrical equipment of the hoist shall comply with the provisions of the drawings and instructions and all electrical equipment shall be reliably grounded.
After each hoist is installed, clean and repair the damaged protective paint and fill it with grease.
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Hand screw hoist】are provided by member【Hebei Xinhe County Xiangtian Water Conservancy Machinery Factory 】,By Titker Trade Network members 【Hebei Xinhe County Xiangtian Water Conservancy Machinery Factory 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network