Pay attention to the following matters
If the system needs to be overhauled and shut down, all equipment in each system must be shut down and the mixing device must be shut down. tank, and the slurry in the tank is stored in the accident propeller tank. At this time, only the pit mixer is put into use.
>
During the shutdown period of the limestone slurry desulfurization mixing device, in order to prevent the limestone slurry from settling, the limestone slurry tank must be drained before stopping the limestone liquid pump and the limestone slurry tank.
>
Before the limestone slurry tank desulfurization mixing device is shut down, the material level of the limestone unloading hopper and the limestone storage bin should be reduced as much as possible, and the limestone should be used up during the shutdown. If the limestone storage bin is in storage If the limestone is out of service, the manual gate valve under the limestone storage bin should be closed to prevent limestone from clogging in the limestone storage bin.
>
When it is necessary to overhaul the limestone slurry tank or mixer, the liquid level and slurry concentration should be reduced as much as possible during operation, and the remaining slurry should be drained into the ditch as much as possible after shutdown.
>
This article
Sen Environmental Protection Technology Co., Ltd.
Provided by the technical department
>
If interested, please contact Mr. Liu
>