Hello and welcome toTitker Trade Network!
All-weather plastic runways, artificial grass football fields, ten

free member

Prerequisite work for the construction and laying of plastic track in track and field fields

total supply
20000000 平方
MOQ
500 平方
brand
冠奥通
area
GuangdongShenzhen
Delivery period:
Shipped within 7 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Inspection and analy

Negotiable

Analysis of batching

¥90.00/平方

How to maintain spor

Negotiable

Maintenance reminder

¥280.00/平方

Details that cannot

Negotiable

Analysis on the foun

¥130.00/平方

Shop information

area:Guangdong Shenzhen

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shenzhen Guanaotong Health Industry Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
The ambient temperature of the plastic track
The construction site should be controlled at ℃~℃. Avoid operating at ambient temperatures below ℃ or above ℃. The relative humidity should be controlled below %. The foundation must be smooth and clean. The amount of catalyst should be adjusted according to the temperature and relative humidity. Control the curing speed appropriately. When storing color paste and prepolymer, the lid of the bucket should be tightened, and the water content should be tested before use. Use it after passing the test. The water content in the foundation should also be controlled to avoid bubbles after gelling. All this is to ensure The runway is laid on a qualified foundation.

Test before paving construction: First, sort the two-component slurry and prepolymer used in the polyurethane plastic track
according to the production batch number. Then samples were taken for gel-forming tests and wire-drawing gel-forming tests according to the on-site environmental conditions. If it is found that the gelling speed of a certain batch of slurry is too slow, adjust the amount of catalyst to adjust the gelling speed to achieve a suitable gelling speed. If it is found that a certain batch of slurry does not form gel, adjust the amount of prepolymer to improve it to achieve gel formation. If it is found that foaming occurs in a certain batch of slurry or a certain barrel of slurry during the gelling process, the batch of slurry or this barrel of slurry will be stacked separately and returned to the factory for rework.

Nailing the molding strips: Nail the wooden molding strips wrapped with polyethylene film along the drawn bottom line according to the pre-arranged area. The mold strips must be flat and nailed to the foundation to prevent material leakage during the construction of the plastic track.

Bottom line of measurement and mapping: In order to reasonably arrange the daily paving workload, we must first measure and draw the dividing lines according to the set plan, divide the entire track and field into strips, and then press the strips and blocks. Carry out paving. In order to ensure smooth drainage and few joints, plastic track construction generally adopts the construction procedure of first inner ring and then outer ring.

Preparation of finished products: Calculate the required semi-finished products based on the pavement area of the plastic track
project, hoist the required slurry and prepolymers to the operating table respectively, and arrange them neatly according to the batch number. Place the required black colloidal particles and catalyst in appropriate locations on the operating table.

Guanaotong has seventeen years of construction experience in the sports ground construction industry, and has witnessed more than 10 professional sports ground projects nationwide. A professional sports venue construction team and excellent sports venue construction technology can provide you with a one-stop construction solution for your plastic track construction.
Guanaotong is the first brand of sports venue construction in China, free consultation nationwide: or contact Ms. Wang, welcome to consult and discuss business.
Address: Floor, Jialin Haoting, No. Shennan Avenue, Futian District, Shenzhen
For more services, please visit the following website:

Sports Wood Flooring:

Leisure chairs, garden chairs:

Sports wooden floor:

Landscape boat:

Sports wooden floor price::b/

Silicon court:

Acrylic court::b/

"Prerequisite work for the construction and laying of plastic track in track and field fields"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Prerequisite work for the construction and laying of plastic track in track and field fields】are provided by member【Shenzhen Guanaotong Health Industry Co., Ltd. 】,By Titker Trade Network members 【Shenzhen Guanaotong Health Industry Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network