For the school, the construction of the plastic track in the sports ground is a big project, and there is a lot of preparation work that needs to be done before the start of construction. So what are the preparations before laying the plastic running track surface? Guanaotong will tell you below in seven points
Plastic track
Preparation for measurement work
When handling shift handover, review the base points of the leveling points to ensure construction quality.
, plastic track
Preparation for the arrival of the main materials required for the project
In order to ensure the smooth progress of the construction period, conduct a survey of the material market and conduct material inspection in advance, and purchase high-quality materials and materials according to the requirements of the design drawings. Raw materials to ensure adequate supply of materials.
, Main mechanical equipment preparation
In order to speed up the construction progress and ensure the construction period, all on-site construction equipment will be maintained and debugged by the project management department in advance, and on-site arrangements will be made in a timely manner according to the time limit of the project. , to ensure the construction needs of the plastic track in the sports field.
, construction water, electricity
Construction and domestic water will be provided by utilizing the existing water pipelines on campus. The electricity used for construction is connected to the nearby power grid. To ensure uninterrupted construction, a generator is prepared as a backup.
, plastic runway
Engineering construction technical preparation
Organize construction personnel to familiarize themselves with the drawings, try their best to resolve questions before construction, revise and prepare detailed construction organization design and construction plan, and seek opinions from owners .
. On-site handover preparation
Before entering the site, the actual site conditions must be handed over, such as rechecking whether the plane and vertical control, axis, elevation, etc. of the site are consistent with the design requirements, and corresponding procedures must be completed.
, Plastic runway
Preparation of project construction personnel
We will send a construction team with experience in similar project construction to carry out the construction. The project manager team will conduct on-site understanding of the situation before the start of construction and prepare for the construction team to enter the site. Create good conditions for construction.
Guanaotong has seventeen years of construction experience in sports venue construction, and has witnessed more than 100 sports venue projects across the country. A professional sports venue construction team and excellent construction technology can provide a one-stop construction solution for your plastic track project construction.
Guanaotong is the first brand of sports venue construction in China. Free consultation nationwide or contact Ms. Wang. Welcome to consult and negotiate business.
Address: Floor, Jialin Haoting, No. Shennan Avenue, Futian District, Shenzhen
For more services, please visit the following website
Sports wooden flooring/
Leisure chairs, garden chairs/
Sports wooden floor/
Landscape boat/
Sports wooden floor price/
Silicon court
Acrylic court/
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Preparation work for the construction of plastic track in the school sports field】are provided by member【Shenzhen Guanaotong Health Industry Co., Ltd.
】,By Titker Trade Network members 【Shenzhen Guanaotong Health Industry Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!