- 功率:
- 3-5.5kw
- 转速:
- 1420-2820r/min
- 电压:
- 380/660v
Iron Ore Tunnel Drilling Rig
This series of drilling rigs adopts a mechanical transmission structure, which is simple in size, small in size, light in weight, easy to operate and reliable in performance. The drilling rig is equipped with a hydraulic chuck and a hydraulic feed cylinder.
Scope of application: - Tunnel drilling rigs are mainly used for drilling water holes, geological structure holes, fire extinguishing holes, pumping water and other engineering holes inside mines. It can also drill geological drilling holes and other engineering holes on the ground. Geological drilling holes can also be drilled on the ground and holes for aluminum ore and iron ore for other purposes are used to drill rocks to facilitate mining of ores.
-The tunnel drilling rig consists of six components, including the gyrator, gearbox, winch, brake, frame, and control panel. - The prospecting drill can meet the requirements of medium and deep hole drilling work and can be used for engineering geological survey, hydrological wells, shallow oil, natural gas, geothermal and large-diameter foundation engineering construction; dam grouting and coal mine tunnel ventilation, water exploration holes and other engineering construction.
- Water exploration drilling rig specifications
Output torque (˙)
Vertical shaft rotation (r/)
Drill pipe used ()
/>
Motor model
&;
Rope capacity of drum()
Drilling depth()
Oil pump model
Motor power()
/
Speed (r/)
Chuck pressure ()
Precautions for drilling rig operation
The drawworks cannot be overloaded.
If there are abnormal sounds, vibrations, heat or oil leakage during operation, stop the vehicle immediately for inspection.
The spring chuck is not allowed to rotate the vertical shaft when it is released.
Maintenance and maintenance of drilling rig
&;The exposed rotating and sliding surfaces should be wiped clean before each drilling shift and a layer of mechanical oil should be applied to the surface.
Ⅱ Every time when disassembling and assembling the chuck, a layer of yellow dry oil should be applied to the threaded part and the sliding surface of the tooth shoe before assembly.
ⅢThe oil used in the oil pump must be clean, free of impurities, and replaced on schedule.
Other models in the series: -, -, -, -.
Factory address: Liying Industrial Park, Rencheng District, Jining City, Shandong Province
Consultation phone number
:
Online: < br/>