- 规格:
- 50kg/袋
- 强度:
- c60
- 包装:
- 防潮牛皮纸袋
⑵ To repair concrete structural defects, the loose concrete should be removed and the steel bars should be exposed, and the edges of the repaired area should be cut into a vertical shape.
⑶ Before grouting, all gravel, dust or other debris should be removed, and the base concrete surface should be moistened
⑷Pour the evenly mixed grouting material into the formwork and tap the formwork appropriately.
⑸ When the thickness of the grouting layer is greater than 100%, relevant measures should be taken to prevent temperature cracks from occurring.
, Construction and maintenance measures
⑴ When grouting, the average daily temperature should not be lower than ℃. After grouting, the exposed parts should be sprayed in time
Curing agent or covered with plastic film and covered with wet straw bag Keep it moist. When covered with plastic film, the exposed surface of the cement-based grouting material should be covered tightly to keep condensation water in the plastic film. When watering is inconvenient, curing agent can be sprayed on the surface of the grouting material.
⑵ The grouting material should be kept in a moist state, and the curing time should not be less than d.
⑶ When using fast-setting and fast-hardening cement-based grouting materials, maintenance measures should be carried out according to the methods required by the product.
⑷ During winter construction, when the project has no special requirements for strength growth, [] after grouting is completed, the exposed parts should be promptly covered with plastic film and covered with insulation materials. The initial curing temperature should not be higher than ℃. Do not water during maintenance under negative temperature conditions.
⑸When the difference between the surface temperature of the cement-based grouting material and the ambient temperature after the formwork is removed is greater than ℃, it should be covered and cured with
thermal insulation materials.
⑹ If the ambient temperature is lower than the minimum construction temperature required for cement-based grouting materials or the strength needs to increase
, artificial heating maintenance methods can be used. The maintenance measures should comply with the current national standard "Construction Engineering
Cheng Dong Period Construction Regulations".