- 规格:
- 50kg/袋
- 强度:
- c60
- 包装:
- 防潮牛皮纸袋
Winter construction
) When the daily average temperature is lower than ℃, winter construction should be carried out and meet the following requirements
) Before grouting, measures should be taken to preheat the foundation surface to keep the temperature above ℃, and remove accumulated water
br/>) The cement-based grouting material should be mixed with warm water not exceeding ℃, and the mold entry temperature of the slurry should be above ℃
) Before being frozen, the compressive strength of the cement-based grouting material shall not be less than M.
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Heze machine base installation grouting material manufacturer】are provided by member【Beijing Huabao Vision Construction Technology Co., Ltd.
】,By Titker Trade Network members 【Beijing Huabao Vision Construction Technology Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!