Hello and welcome toTitker Trade Network!
Reinforcement of road and bridge projects, reinforcement and renov

free member

Xuecheng grouting material factory direct sales

价格 700.00元/吨
total supply
1111 吨
MOQ
1 吨
brand
华宝远景
area
ShandongJining City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shandong Jining City

Member level:corporate memberYear1

identity:   

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Beijing Huabao Vision Construction Technology Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
规格:
50kg/袋
强度:
c60
包装:
防潮牛皮纸袋
Conventional physical properties of grouting materials Construction methods
Before grouting construction, mixer, grouting equipment, templates and maintenance items should be prepared.
During secondary grouting, the horizontal distance between the formwork and the equipment base should be controlled so that the top elevation of the left and right formwork should not be lower than the upper surface of the equipment base.
When the concrete structure is renovated and reinforced, sufficient grouting holes and vent holes should be left in the formwork support, and the grouting hole diameter should not be less than the spacing and not exceed the spacing.
When mixing cement-based grouting materials, water should be added according to the amount of water required by the product. Mechanical mixing should be used. When mixing, it is advisable to first add / of water to mix approximately, then add the remaining water and mix until evenly mixed. The mixing location should be close to the grouting location.
Anchor bolt grouting
⑴ When the anchor bolt hole is made, the wall of the bolt hole is rough, so the hole should be cleaned and there should be no floating ash
Before grouting, oil and other impurities should be soaked in water to remove the accumulation in the hole. inflammation.
⑵ Oil and rust on the surface of the anchor bolts should be removed before grouting.
⑶ When pouring the mixed cement-based grouting material into the bolt hole, the
position of the bolt can be adjusted as needed. It is strictly prohibited to vibrate during the grouting process, and do not adjust the bolts again after the grouting is completed.
Secondary grouting of equipment foundation
⑴Before grouting, the equipment floor and concrete foundation surface in contact with grouting materials should be cleaned up
There should be no loose gravel, floating slurry, floating ash, oil, dirt, wax, etc. . The soil surface of the foundation concrete before grouting should be fully moistened and water should be removed before grouting.
⑵ When grouting for the second time, grouting should be carried out from one side until it overflows from the other side. Grouting should not be carried out from both opposite sides at the same time. After the grouting starts, it must be carried out continuously and the grouting time should be shortened as much as possible.
⑶ When the track foundation or grouting distance is long, construction can be carried out in sections depending on the actual engineering conditions
The length of each section should not exceed meters. If the equipment floor has a complex structure, pressure grouting should be used.
⑷ Vibration is strictly prohibited during the grouting process. If necessary, a grouting booster can be used to push the grouting material along the direction of the grout flow. It is strictly prohibited to push the grouting material from the middle and upper part of the grouting layer.
⑸ After the equipment foundation grouting is completed, it is advisable to cut the grouting material along the edge of the bottom plate toward outsiders after the initial setting.
If the bevel cannot be trimmed, use a spatula to press the surface of the grouting layer after the initial setting.
Light.
"Xuecheng grouting material factory direct sales"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Inorganic active thermal insulation mort Anhui Fuyang tactile pavement tiles/Zhon Xi'an manufacturers supply 108 construct Welcome to Zhongguan acid-resistant bric Heze high-strength non-shrink grouting m Tianjin high strength non-shrinkage grou Qamdo concrete inorganic wear-resistant What to do if the wall becomes sandy and How to repair honeycomb leaking reinforc Hubei Yichang tactile pavement bricks/hi Hunan Chenzhou tactile pavement bricks/t Special automatic pressure grouter for c What grouting material is used to reinfo Tianjin factory direct sales JT-30 polym Loudi; Qinlu color embossed floor constr
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Xuecheng grouting material factory direct sales】are provided by member【Beijing Huabao Vision Construction Technology Co., Ltd. 】,By Titker Trade Network members 【Beijing Huabao Vision Construction Technology Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network