How to construct diatom mud and what should you pay attention to?

total supply
0
MOQ
0
brand
优泥硅藻泥
area
JilinChangchun City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Why are diatom mud w

Negotiable

Diatom mud must abso

Negotiable

Youni diatom mud giv

Negotiable

It goes better with

Negotiable

Chinese diatom mud b

Negotiable

Create a warm, healt

Negotiable

Shop information

area:Jilin Changchun City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Excellent mud diatom mud

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details

Technically prepare the diatom mud construction plan for the wall and provide written technical explanations to the workers.
The diatom mud should be prepared with materials that meet the design requirements. It should have a product certificate and test report, and the environmental protection indicators should meet the relevant national standards. There should be a storage validity period and product certificate, and the variety and color should meet the design requirements.
Tools: Prepare at least one mixer bucket, mixing bucket and water bucket, foam spatula, dust removal and polishing scraper, small brush, small spatula, towel, at least two ladders, multi-tooth tools, bark stick, tape measure, infrared measuring instrument for large area Measuring indoor air formaldehyde detector, special mulch film, overalls, shoe covers, masking paper, imported for modeling and domestically produced to protect the corners, etc. If there are construction patterns and paint, you need to bring related tools and equipment such as air compressor, inkjet connection line, etc.
When preparing for painting operations, operators should wear corresponding labor protection equipment.
Construction wall conditions requirements
Ensure that the base surface is flat, dense, clean, and the yin and yang angles and lines are horizontal and vertical. Construction is prohibited on frozen and water-seeping walls
All plastering operations are completed, and the yin and yang of the pipe openings passing through the wall are prohibited. Corners and other places should be plastered, leveled, rested and fully dried in advance. Wall cracks should be dealt with in advance
Kick flat the protruding parts on the surface such as concrete lintels, beams, gaskets, beams, concrete columns and beams. The holes for feet, hand holes and exhaust gas should be blocked tightly. Exposed steel bars, lead wire heads and wood should be removed and rust-proofed. Window sills should be patched up, and the junctions between walls and floor beams should be patched up with sloping bricks
Bases that are hollow or cracked must be treated in advance. After cleaning, apply putty twice to the base.
Construction environmental conditions requirements
The wall temperature should be above ℃, the relative air humidity should not be greater than ℃, the wind force during construction should not be greater than level. If it is lower than +℃, construction should be stopped
In summer, construction should not be carried out when the temperature is above +℃. If construction is necessary, shading measures should be taken to avoid direct sunlight
Construction should not be carried out on rainy days. If construction is necessary, it should be covered with rainproof cloth. Protect.
Construction process
Lay the special mulch film, protect the existing finished products before construction, and protect areas other than the construction surface in advance
Use a small spatula to handle the flatness of the wall
Use domestic textured paper to protect the baseboards and sockets near the door and corners
Stir diatom mud in the bathroom. Unpack the diatom mud box, open the inner package and pour it into the clean bucket prepared in advance. Use another bucket to collect the appropriate amount of clean water. Pour the clean water into the previous diatom mud material bucket, add water according to the proportion and stir. The wire is connected to the socket, hold the mixer tightly and put it into the bucket to stir. After mixing, use a small spatula to dig out some material vertically to see if it slowly falls down. If it flows down quickly, the material is too thin, such as If it does not fall off, it is too thick. You should continue to add water or ingredients, and stir again until it is evenly mixed and the consistency is moderate.
After the construction is completed, go to the bathroom to rinse all tools and items and then require the customer's signature for confirmation
Other matters needing attention
Diatom mud should be waterproof and moisture-proof during storage and transportation. Avoid placing it directly on the wet ground
The effective storage period of diatom mud is one year. It should be used up as soon as possible after opening. No other ingredients should be added
Prepare the finished product before diatom mud construction. Protection work, pre-curing materials for protection in places other than the construction surface
When blending diatom mud materials, add water in strict accordance with the prescribed proportions, and stir thoroughly with an electric mixer to avoid color difference in the finish. At the end of the construction, each color of silicone A small amount of algae mud is reserved for customers. In order to prevent subsequent construction and maintenance, the newly adjusted color will have errors
Bases with hollows or cracks must be treated in advance. If necessary, the base should be fully oiled or pre-scraped with paint.
Avoid direct sunlight exposure during diatom mud construction, and be careful not to use air conditioning fans or open windows for ventilation. Drying too fast increases the difficulty of texture construction
It usually takes hours for diatom mud to dry completely, so do not touch it within hours. After an hour, you can use a spray bottle to sprinkle a small amount of water, and after drying, use a clean towel or sponge to foam to remove surface floating materials.
"How to construct diatom mud and what should you pay attention to?"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Can ovarian cancer take ginsenoside RH2? 036-3, 036-4 type static conductive oil- 036-1, 036-2 oil-resistant and anti-corr FC-flexible ceramic wear-resistant, heat H52-60 epoxy rust-proof anti-corrosion p H90 epoxy acid-resistant and anti-corros H87 temperature resistant anti-corrosion H94 flame retardant, conductive, static, S97 salt spray resistant anti-corrosion HT515 special anti-corrosion coating Epoxy electrostatically conductive anti- Water-based nickel electromagnetic shiel Solvent-free epoxy anti-corrosion coatin Zhongshan single-component polyurethane Zhongshan environmentally friendly polyu
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【How to construct diatom mud and what should you pay attention to?】are provided by member【Excellent mud diatom mud 】,By Titker Trade Network members 【Excellent mud diatom mud 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network