During the implementation of the plastic runway project, there are certain conditions. For example, the surface temperature during construction should be within the range of 10 degrees, and the weather should be sunny, fog-free, and with low relative humidity. In order to ensure the quality of the entire plastic track project, construction workers are best to follow these conditions during the construction process to avoid the product not achieving its intended effect and affecting the company's image. Next we will talk about some detailed requirements for water during the implementation of the
plastic track
project.
Plastic track
During the implementation of the project, water should be avoided as much as possible, because the plastic track is a polyurethane plastic material. After laying the rubber surface of the plastic track, local blistering and peeling will occur. This is because the density control of the base layer of the plastic track is unreasonable. It is necessary to strictly control the density of the
plastic track
to prevent The asphalt base layer itself is not fully embedded, resulting in shelling and delamination, the surface of the plastic track is vaporized, and the base surface layer is even pulled apart.
Therefore, during the implementation of the
plastic runway
construction workers must do a good job in waterproofing. During the construction period, they should be equipped with plastic sheets and listen to the weather forecast at any time. If there is a sudden encounter during the construction, Water, stop work immediately and cover the laid plastic surface to ensure there are no quality problems. Once the glue of the plastic track encounters water before it is initially cured, bubbles will be generated, which will affect the laying quality of the plastic track.
In addition to preventing rain, the sweat of construction workers will also affect the curing of
plastic track
glue. When construction workers of plastic runways are laying work in a high-temperature environment, they should prepare towels to wipe sweat in advance. The time for laying glue should be avoided as much as possible in the morning when the humidity in the atmosphere and on the ground is high. During the construction process, construction personnel should arrange each process strictly and reasonably to ensure the quality of project construction.
Guanaotong has seventeen years of construction experience in sports venue construction. The professional sports venue construction team and excellent construction technology can provide one-stop construction for your plastic track
Surface construction Solutions, witnessed by more than a thousand sports surface projects across the country, are the testimony of Guanaotong's technology and strength.
Guanaotong is the first brand of sports venue construction in China. Free consultation nationwide or contact Ms. Wang. Welcome to consult and negotiate business.
Address Floor, Jialin Haoting, No. Shennan Avenue, Futian District, Shenzhen
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Guanaotong reminds you of the construction issues regarding water in the plastic runway project】are provided by member【Shenzhen Guanaotong Health Industry Co., Ltd.
】,By Titker Trade Network members 【Shenzhen Guanaotong Health Industry Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!