Hello and welcome toTitker Trade Network!
c-beam H-beam processing steel structure steel structure processin

free member

Technical briefing on hoisting safety of steel structure components

total supply
0
MOQ
0
brand
睿玲
area
Shanghai
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shanghai

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shanghai Ruiling Construction Steel Structure Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Summary of safety technical briefing on hoisting steel structure components
Correction columns without cable wind ropes should be calibrated as they are hoisted. However, if the eccentricity is large, slender, and/or the depth of the cup mouth is less than the length of the column, it is prohibited to enter the site without cable wind rope correction. You must wear a safety helmet, fasten the hat strap, and use personal protective equipment correctly.
Special racks should be used for structural components that are easy to collapse. After unloading, they should be placed firmly and firmly supported to prevent collapse.
When components are directly lifted and unloaded on the floor of the engineering structure, overload stacking is strictly prohibited.
Erection workers, lifting drivers, commanders, and other lifting workers must hold special operation certificates to work.
Before installation, check whether the mechanical rigging, clamps, lifting rings, etc. meet the requirements and conduct a trial lifting.
There must be a unified command and unified signal during installation.
When the hanging roof truss is raised from the inside to the outer panel, the hook should be lifted first to stabilize and cooperate with the telescopic arm. When the hanging roof truss is lifted from the outside to the inner panel, the arm should be extended first to cooperate with the hook. In any case, operations must be carried out only after the crane legs are extended and supported firmly.
Extend the arms without extending the outriggers. The roof trusses at
should be placed on pre-embedded iron plates, with no less than three diagonal braces on both sides, and should be welded in time with the cooperation of welders. Leaning on pillars is prohibited.
Introduce the pillar into the mouth of the cup. Place the cross axis at the mouth of the cup in advance to align it. The lifting point rod should be pried back. Two wedges are needed on each side to temporarily fix the column. The hook should be hammered tightly before loosening the hook.
The wind rope correction posts should be calibrated as they are hoisted. However, when the eccentricity is large, slender, and the depth of the cup opening is less than the length of the column/or is insufficient, uncable wind rope correction is prohibited.
It is forbidden to place any objects on plate-shaped and other components for lifting.
When installing components that are difficult to place stably, use snap rings instead of hooks directly.
When installing roof panels and floor panels, it is prohibited to stack sheets on the structural floor with excessive load.
In the event of severe weather such as heavy rain, fog, snow or gusty winds above level 6, operations must be stopped immediately.
Implement the ten rules of not lifting
Do not lift if the lifting command signal is unclear
Do not lift if the load is overloaded
Do not lift if the workpiece is not fastened firmly
No one is on the lifting object. Hoisting
Do not lift if the safety device is not working
Do not lift if the workpiece is buried underground
Do not lift if the workpiece is diagonally pulled
Do not lift if the light is dark and cannot be seen clearly
Small accessories or short materials Don’t hang it if it’s overfilled
Don’t hang it if corners are not protected by padding or other corner protection measures.
Shanghai Ruiling Construction Engineering Co., Ltd. has been providing professional services for 20 years, specializing in the processing and production of various types of steel structures and embedded steel components. Your satisfaction is our pride.
Headquarters address Room No. 1, Shanghai Office Building, No. 1 Zhongshan North 1st Road, Hongkou District, Shanghai
Contact person Mr. Jin
Mobile phone
Telephone number
"Technical briefing on hoisting safety of steel structure components"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Technical briefing on hoisting safety of steel structure components】are provided by member【Shanghai Ruiling Construction Steel Structure Co 】,By Titker Trade Network members 【Shanghai Ruiling Construction Steel Structure Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network