Supplying nationwide high-strength non-shrinkage grouting material non-shrinkage grouting material grouting material manufacturer grouting Material price Zhongshan grouting material manufacturer direct sales concrete grouting material grouting material secondary grouting material bearing grouting material epoxy resin grouting material Shandong grouting material polyurethane grouting material grouting material formula high strength grouting material Qingyuan grouting material manufacturer epoxy grouting material grouting material distribution Ratio equipment grouting material equipment secondary grouting material power plant grouting material Shenzhen grouting material high temperature resistant grouting material grouting material solution weight grouting material purpose grouting material strength standard 3 non-shrinkage grouting material concrete grouting material price Guangzhou high-strength non-shrinkage grouting material Foshan epoxy grouting material Manufacturer of super-strength grouting material, early-strength grouting material, anchor bolt anchor grouting material
High-strength non-shrinkage grouting material manufacturer, high-strength non-shrinkage grouting material manufacturer direct selling price
The first step: foundation treatment
Foundation surface It should be chiseled. Clean the foundation surface, and there should be no gravel, laitance, floating dust, oil stains, release agents and other debris.
One hour before grouting, the foundation surface should be fully moistened, and one hour before grouting, any accumulated water should be removed.
Step 2: Support and touch
Set up the template according to the grouting construction drawing. The joints between the formwork and the foundation and between the formwork and the formwork should be sealed with cement slurry, tape, etc. to ensure that the entire formwork does not leak.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the formwork should be higher than the upper surface of the equipment base.
If grouting occurs during grouting, it should be dealt with in time.
Step 3: Preparation of grouting material
Generally speaking, add water and stir according to the standard of 3- for the general reinforced type, and add water and stir according to the standard of - for the pisolite reinforced type.
It is recommended to use mechanical stirring method, and the stirring time is generally - minutes (hand-operated electric drill type stirrers are strictly prohibited). When using manual mixing, first add /3 of the water and mix for 1 minute, then add the remaining water and mix until uniform.
The amount of stirring each time should be determined according to the amount of use to ensure that the material is used up within minutes.
When used on site, it is strictly prohibited to mix any additives or external additives into the grouting material.
Step 4: Grouting construction method
For long equipment or track foundation, segmented construction should be adopted.
Illustration of several commonly used grouting methods
During secondary grouting, the following requirements should be met.
① When grouting for the second time, grouting should be carried out from multiple points on one side or adjacent two sides until it overflows from the other side to facilitate exhaust during the grouting process. Grouting shall not be carried out from all four sides at the same time.
② After grouting starts, it must be carried out continuously without interruption. And shorten the grouting time as much as possible.
③. Vibration is strictly prohibited during the grouting process. If necessary, the grouting booster can be used to push the grouting material along the bottom of the grouting layer. It is strictly prohibited to push from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.
④ After the equipment foundation grouting is completed, a bevel should be cut outward along the edge of the equipment 3-hours after grouting (see the picture below) to prevent cracks at the free end
If edge trimming is not possible , the surface of the grouting layer should be calendered with a spatula 3-hours after grouting.
⑤ When the thickness of the grouting layer exceeds the thickness of the grouting layer, pisolite-reinforced high-strength non-shrinkage grouting material should be used.
⑥. When the equipment foundation grouting volume is large, mechanical stirring should be used to stir the pisolite-reinforced grouting material to ensure grouting construction.
Step 5: Maintenance
Immediately cover with a wet grass cover or rock wool quilt within 3 minutes after grouting is completed, and keep it moist.
During winter construction, maintenance measures should also comply with the relevant provisions of the current reinforced concrete engineering construction and acceptance specifications (B).
After the grouting material reaches the film removal time, the equipment can be installed. For the specific time, please refer to the relationship table between film removal and curing time and ambient temperature.
After the equipment foundation grouting is completed, if there is any part that needs to be removed, it can be removed gently with a spatula or
shovel tool 3 hours after the grouting is completed, that is, before the grouting layer hardens.
. The vibration of the running machine must not be transmitted to the equipment foundation. The machine should be shut down for an hour after the second grouting to avoid damaging the unhardened grouting layer
High-strength non-shrinkage grouting material price
High-strength non-shrinkage grouting material manufacturer, high-strength non-shrinkage grouting material manufacturer direct selling price
Packaging, storage and transportation
, packaging specifications: / bag, stored in a ventilated place Store in a dry place and away from direct sunlight.
The shelf life is 3 months. If it exceeds the shelf life, it must be re-inspected before it can be used.
It does not contain benzene series, halogenated hydrocarbons, formaldehyde, heavy metals and other ingredients. It is non-toxic, odorless, non-polluting, non-flammable and non-explosive, and can be transported as general cargo.
High-strength non-shrinkage grouting material price