>
>
>Tack drying time ~ Hardness (r)
>Shear bonding strength resistance Tensile strength
>Insulation breakdown strength (/) Temperature range (
℃) ~
>
First clean the surface of the adhered material Clean and remove dust, oil, etc.
> Apply glue to the surface of the product, distribute it evenly, and close the bonded surfaces within minutes.
Put the glued parts in the air and let them solidify naturally. The curing process is a curing process from the surface to the inside. Within hours (degrees/% humidity), the colloid solidifies to a depth of ~ If the gluing position is deep, especially in areas that are not easily exposed to air, the complete curing time will be extended. If the temperature is low, the curing time will also be extended. It will take more than days for thick sealants to fully cure.
>Four Precautions
After the glue application is completed, the unused glue should be capped immediately and sealed for storage. When using it again, if there is a little crust on the seal, just remove it and it will not affect normal use. During the storage process of the glue, a small amount of solidification may occur at the mouth of the tube. After being removed, it can be used normally without affecting product performance.
<5 Storage and transportation:
Please store in a cool and dry place. It can be stored for months at room temperature.
>This type of product is non-dangerous and can be stored in a cool and dry place. Transport as general chemicals, be careful of leakage during transportation!
Products that have exceeded the shelf life should be confirmed for any abnormalities before use.
>Six pack specifications:
/
branch,
/
branch