Product Details
Two-component epoxy primer/
Intermediate leveling layer
Uses
△ Suitable for concrete base
Cement leveling layer and Primer for epoxy mortar
△ Suitable for highly absorbent substrates
△ As a primer for economical epoxy floor systems
and
△ Leveling mortar/
A good medium for spreading layers
△ As an intermediate layer
for epoxy floor systems
and
Advantages
◇ Comply with standards/
◇ Low viscosity
◇ Excellent penetration
◇ Good adhesion
◇ Solvent-free
◇ Easy construction< br/> ◇ Short waiting time between coats
◇ Multi-purpose
Product Data
Composition
Appearance/
Color
Resin
Components
Brown clear, liquid
Curing agent
Components
Clear, liquid
Packaging
Resin
Components
kg /
Barrel
Curing agent
Components
Kg/
Barrel
Storage conditions/
Warranty
In+
To+
Under dry conditions
Packaging ensures sealing
Not opened and other good storage conditions
The product quality guarantee period is two years after the production period.
Technical indicators
Chemical composition
Epoxy resin
Density
Part
kg/
L
Part~
kg/
L after mixing~
kg/
L)
All the above density indicators are tested in a +
environment
Solid content
~ (
Volume) / ~ (
Weight)
Physical indicators
Compressive strength
Resin ~ (
days/ +)/
Flexural strength
Resin~ (
days/ +)/
Bonding strength
(
Concrete failure)/
Shore hardness
(
Day
+)/
Base surface conditions
The base concrete needs to have sufficient strength (
Compressive strength is at least/
Tensile strength is at least/ )The surface must be smooth
Clean
Dense
Dry
and free of loose particles
The surface must be clean
Free of dirt
Grease, etc.
If you are not sure about the surface base layer
If in doubt, please do a small sample test first
Preparation for base layer treatment
Mechanical methods such as sandblasting or grinding must be used to completely remove cement laitance and cement slurry with insufficient strength. Oil stain
Until an open base with good surface strength and roughness is obtained, the soft concrete must be removed
The loose concrete surface voids
The pores must be fully exposed
Patch and fill the concrete The voids/
pores on the surface should be treated with appropriate Sika special systems
and
Concrete base treatment
Leveling is to obtain a smooth and beautiful surface
It is difficult to treat It is recommended to grind the raised points
All dust
Loose laitance must be completely removed before construction
Steel brush and vacuum can be used
Construction conditions and restrictions< br/> Base temperature
+
to +
Surrounding environment
+
to +
Base humidity
Base moisture content
Test method
Method or
Test method
No rise in moisture
Meet
standard (
Polyethylene board method)
Relevant air humidity Maximum
Relative Humidity
Dew Point
Beware of Condensation
The base layer and uncured floor must be higher than the dew point temperature
to reduce condensation or blooming on the surface. risks of.
Construction instructions
Mixing
Resin
Curing agent (
Weight ratio)
Stirring time
Before mixing
Stir thoroughly first
br/>Components (
Resin
Then add all
components
Continuously stir for three minutes until a homogeneous mixture is obtained
When
components After completing the mixing
Add quartz sand and optional additives (
Thixotropic agent)
Stir for another two minutes until a homogeneous mixture is obtained
Pour the materials into another mixing container
Ensure sufficient and uniform mixing
Avoid over-stirring and introducing too much air.
Stirring tools
Must use)
electric stirrer with high speed and other suitable mixing tools. If a forced mixer is used for mixing the mortar layer, the material dripping on the mixing blades cannot be used.
Construction methods/
Tools
Before construction
Check and confirm the moisture content and dew point of the base layer
If the moisture content of the base layer
needs to be used
do For
systems (
temporary moisture barrier)
as primer
Continuously apply
brush
roller to the concrete surface
It can be applied twice if necessary
As leveling mortar
Rough concrete must be leveled first
Use the leveling mortar to use a rubber roller or scraper to scrape it to the required thicknessbr/> As the middle Layer
Pour
onto the base layer, spread it evenly with a sawtooth scraper, and immediately use a defoaming roller to roll it in both horizontal and vertical directions to ensure a uniform thickness. If you need to throw sand, you need to throw it lightly after
minutes before
minutes (
), and then throw it fully.
As an adhesive layer
Use a brush
Roller or squeegeebr/> As a mortar layer/
Repair
While the adhesive layer is still sticky , use a horizontal plate and pressure strip to find the level
After a short waiting time, use a scraper or a polisher with a Teflon surface to compact (
speed)
Equipment/
Tools Cleaning
Tools and equipment should be cleaned immediately after use
Cleaning
Those that have hardened/
cured must be removed mechanically
Remarks on construction restrictions
Cannot be used On base concrete with obvious rising moisture
The construction has just been completed
Moisture must be strictly prohibited
Condensation and water for at least
hours
Avoid contamination of the completed work. Primer
The mortar layer cannot be constructed in places that are often exposed to water vapor
Unless the base layer has been sealed
Choose the most suitable aggregate in actual operation
Outdoor construction should be done when the temperature drops. Construction, if the construction is done when the temperature rises, needle holes will occur.
Remarks
All technical indicators in this technical manual are laboratory data
In reality, the technical performance may
vary depending on environmental changes
Changes
Local restrictions
Due to different specifications for the performance of this product in different countries
For specific construction field descriptions of this product
Please consult local product technical information
Health & Safety
For information and recommendations on the safe handling, storage and handling of chemicals, users should refer to the latest Material Safety Manual which contains physical, biological, toxicological and other relevant safety data.
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Two-component epoxy primer/intermediate leveling layer】are provided by member【Shanghai Shuochuang Building Materials Co
】,By Titker Trade Network members 【Shanghai Shuochuang Building Materials Co
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!