Deformation joint rubber deformation joint ER1 exterior wall expansion joint building deformation joint exterior wall cover can be installed in a package
- total supply
- 0 米
- MOQ
- 100 米
- brand
- 京茂
- area
- Beijing
- Delivery period:
- Shipped within 3 days from the date of payment by the buyer
- Where to buy water-s¥15.00/米
- Where to buy buildin¥15.00/米
- How much does a buil¥15.00/米
- According to the dra¥200.00/米
- 1T Longsheng low heaNegotiable
- Guangdong Shaoguan b¥300.00/米
- Supply RG80 type exp¥220.00/米
- Nanchang building wa¥10.00/米
- Supply GQFC-40 expan¥200.00/米